The last of 292 concrete piles that will form the foundations for the UK’s longest...
HS2 minister Huw Merriman has becomee the first person to officially walk on top of...
HS2 Ltd is celebrating a world-first as around 450 people from HS2’s construction...
HS2 Ltd has revealed designs for the 150-metre section of viaduct as part of the...
HS2 Ltd is gearing up to welcome the local community to a series of events to share...
HS2 Ltd has launched the fifth Tunnel Boring Machine (TBM), ‘Caroline’, that ...
HS2 Ltd has opened applications for innovative tech start-ups to join its successful...
HS2’s Long Itchington Wood Tunnel TBM’s giant cutterhead has been transported...
HS2 Ltd is celebrating the very first tunnelling breakthrough on Europe’s largest...
HS2 Ltd has announced that Laing O’Rourke Delivery Limited will build HS2’s new...
The first design images have been revealed of Washwood Heath Depot, HS2’s...
HS2 Ltd has been granted Schedule 17 consent by Birmingham City Council for two...
HS2 has started construction at the site of its first innovative ‘green tunnel’,...
In a UK-first, an SME graduate of HS2’s Innovation Accelerator programme is ...
HS2 Ltd has announced the start of construction on the railway’s first and longest...