First big HS2 contracts revealed

Public Sector Mon, Jul 17, 2017 9:11 AM

The winners of the major construction contracts for Britain’s new railway have been announced, with the £6.6 billion contracts supporting 16,000 jobs across the country.

The huge infrastructure investment covers the main civil engineering work on the first phase of HS2 between London and Birmingham – including construction of tunnels, bridges, embankments and viaducts.

Transport Secretary Chris Grayling announced the decision to award contracts today, which will mean the new high speed link reaching Birmingham by 2026.

David Higgins, Chairman of HS2 Ltd, said: "This is a huge day for the HS2 project and for the country. These contracts will support 16,000 jobs here in Britain and will create opportunities for thousands of SMEs.

"HS2 was always designed to be much more than just a high speed railway and today we can see the opportunities it brings right around the country - spreading prosperity, acting as a catalyst for investment and rebalancing our economy 10 years before the railway even opens. Business now has the surety to invest with confidence to build a legacy for Britain."

The winning bidders to build the first phase of the route are:

Area South

  • Euston Tunnels and Approaches – SCS JV (Skanska Construction UK Ltd, Costain Ltd, STRABAG AG)
  • Northolt Tunnels – SCS JV (Skanska Construction UK Ltd, Costain Ltd, STRABAG AG)

Area Central

  • Chiltern Tunnels and Colne Valley Viaduct – Align JV (Bouygues Travaux Publics, VolkerFitzpatrick, Sir Robert McAlpine)
  • North Portal Chiltern Tunnels to Brackley – CEK JV (Carillion Construction Ltd, Eiffage Genie Civil SA, Kier Infrastructure and Overseas Ltd)
  • Brackley to South Portal of Long Itchington Wood Green Tunnel – CEK JV (Carillion Construction Ltd, Eiffage Genie Civil SA, Kier Infrastructure and Overseas Ltd)

Area North

  • Long Itchington Wood Green Tunnel to Delta Junction and Birmingham Spur – BBV JV (Balfour Beatty Group Ltd, VINCI Construction Grands Projets, VINCI Construction UK Ltd, VINCI Construction Terrassement)
  • Delta Junction to WCML Tie-In – BBV JV (Balfour Beatty Group Ltd, VINCI Construction Grands Projets, VINCI Construction UK Ltd, VINCI Construction Terrassement).

HS2 could carry more than 300,000 people a day. And with fast trains using the new line, there will be extra space for more trains on the existing rail network.

Benefits will be felt across the network with trains running as far as Scotland and the number of seats available out of Euston in peak hours more than doubled.

In total, construction of the full HS2 route to the north-west and Yorkshire will create up to 25,000 jobs and 2,000 apprenticeships. Another 3,000 people will operate HS2 and it is estimated that growth around new HS2 stations will create another 100,000 jobs.

In February, Parliament granted powers to construct the Phase One route from London Euston to Birmingham, with the route opening in 2026.

Preparatory works are already underway, with main construction work starting in 2018/19 following a period of detailed design work.

In addition, HS2 stations at Euston, Old Oak Common and in Birmingham will be central to HS2 and the work needed to develop designs is also well underway. Both the invitations to tender (ITTs) for the station design services contracts for all 4 Phase One stations and the invitation to participate in dialogue (ITPD) for the Euston Master Development Partner have been released to shortlisted bidders.

These are significant milestones which show how progress is continuing to deliver stations that will be embraced by the local communities, drive economic growth and provide seamless journeys for passengers.

A series of other HS2 announcements are taking place today.

The Transport Secretary will today publish a Bill to deliver the next phase of HS2, from the West Midlands to the West Coast Main Line south of Crewe.

This means - subject to Parliamentary approval - this part of the route can open in 2027, 6 years earlier than planned, to bring the benefits of HS2 to the north and Scotland sooner.

The Transport Secretary will also confirm the final Phase 2b route, from Crewe to Manchester and Birmingham to the East Midlands and Leeds. This phase will complete HS2 and unlock the transformative project’s full benefits for the country.

Featured News

Specification news
Solid hardwearing floor for new gallery

Junckers’ solid wood flooring forms an integral part of the interior scheme at the...

Read More >>

Specification news
dormakaba launches BS EN 13637 compliant escape route...

Leading provider of security, entrance and access solutions, dormakaba has launched a...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

FRAMESAFE FR A2 FIRE RATED EXTERNAL WALL BREATHER MEMBRANE  Brochure

FRAMESAFE FR A2 FIRE...
By Glidevale Protect

Download Now >>

A Guide to Aluminium Fencing Brochure

A Guide to Aluminium...
By F.H. Brundle

Download Now >>

Handrailing & Balustrade Systems Brochure

Handrailing & Balust...
By F.H. Brundle

Download Now >>

RLG600 Access Flooring System Brochure

RLG600 Access Floori...
By Kingspan Data & Floo...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Straightcurve® Product Range Overview - A Demonstration of Installation Ease
Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Watch Now >>

Forma aluminium column casings for Winchester College
Forma aluminium column casings for Winchester College

In progressive and dynamic business sectors, such as construction, it’s natural to be forward...

Watch Now >>

Decorative metal bulkheads & column casings for Tesco Extra, Birmingham
Decorative metal bulkheads & column casings for Tesco Extra, Birmingham

Decorative aluminium horizontal bulkheads more than 100 metres long have been supplied and installed...

Watch Now >>