Latest News Wed, Jul 20, 2016 10:29 AM
Contractor Mitchellson Formwork opted for the DOYMA Curaflex pipe sleeve – 3000 and 3000T –as well as the 3001 DOYMA Curaflex pipe sleeve. Also specified was the DOYMA Curaflex 5000 pipe sleeve systempipe sleeve system.
Benefits of the 3000 and 3000/T solutions include homogeneous connection to concrete enhanced by special grooving, plus the inside face of the sleeve provides an optimum contact surface for the elastomer of the Curaflex gasket insert. It forms a watertight bond with the concrete because the coefficient of expansion of the material corresponds to that of concrete and is ideal for buildings without tanking membranes.
The DOYMA Curaflex 3000 and 3001 pipe sleeves are manufactured from a dimensionally stable and resistant special fibrous cement; /T denotes split version for retrofitting around pre-installed services which can then be sealed using a split gasket. The capability to seal leaking service entries without having the inconvenience of disrupting continuity of service resulting from service disconnection is a real advantage.
The DOYMA Curaflex 5000 pipe sleeve is a steel version for high static loads with integrated fixed and loose membrane clamping flanges and can also be installed flush within the shuttering. DOYMA Curaflex sleeves are fire resistant and, in conjunction with an intumescent packing appropriate to the ducted service, not only seal against water ingress (watertight up to 3 bars pressure) but also stop the spread of fire.
Designed by Duggan Morris Architects, R7 is a versatile building that can accommodate small and growing companies as well as larger occupiers requiring an entire floor or more. Over ten floors,R7 integrates shared spaces to encourage collaboration and community, including a 6,000 sq ft communal roof terrace.
R7 is perfectly positioned at London’s main transport hub, with all the amenities of vibrant King’s Cross on your doorstep. The upper office levels have highly flexible floorplates. These can be sub-divided into a variety of smaller or larger areas with the ability to link floors vertically via internal stairs.
Each floor will have at least one terrace, with a large, shared roof terrace on the ninth floor. A basement ‘cycle spa’ provides 260 bike spaces, changing rooms and showers.
Featured News
A major government office complex has been given planning consent to be built in...
NHBC has announced renowned broadcaster, journalist and author Louise Minchin as its...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Your high performanc...
By James Hardie
James Hardie brings...
By James Hardie
fermacell® The Speci...
By James Hardie
Hardie backer fibre...
By James Hardie
RIVERSTONE® - DISCOV...
By SSQ
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...
FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...
FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Specification Insights with Majestic London Showers
“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...
Portakabin | Installation at the iconic Admiralty Arch, London