Meeting MCPD demands for industrial boilers

Sustainability Tue, Jan 30, 2018 1:52 PM

With the Medium Combustion Plant Directive (MCPD) now European law, Kevin Houlden, Industrial and Commercial Specialist at Calor, advises on the steps that operators can take to upgrade their existing boiler plant.

The MCPD became European law on 19th December 2017, setting emissions limit values (ELVs) to reduce levels of harmful sulphur dioxide (SO2) nitrogen oxides (NOX) and particulates in exhaust gases from all combustion plant rated between 1 MW and 50 MW thermal input.

All new plants that are first operated after 20 December 2018 must be registered with the Competent Authority and comply with new ELVs from that date.

However, currently only five of the 43 Air Quality Zones in the UK meet the requirements for NOx emissions levels laid out in the directive, with slow progress forecast over the next twenty years. The MCPD rules also allow the Competent Authority to change these limits because of poor local air quality should they choose to do so, meaning the finished regulation in the UK is still to be determined, particularly in relation to further restricting emissions in areas that do not meet certain air quality requirements (Directive 2008/50/EC).

For existing heavy fuel oil-fired boilers in particular, it is clear that this fuel source cannot meet future ELVs. As a result, operators considering upgrading or switching their boiler plant in order to ensure compliance with the MCPD need to consider carefully the long-term implications if these ELVs are reduced even further in the future.

The change is expected to affect around 150,000 medium combustion plants across Europe, of which 17,000 are located in the UK, using systems such as boilers, turbines and electricity generators.

In addition, there are around 250,000 businesses located off the mains gas network in the UK. This means that there are a significant number of operators who will face the additional challenge of choosing the cleanest, most economically-viable energy solution when their boiler needs replacing.

The ELVs set in the MCPD will have to be applied from 20 December 2018 for new plants and by 2025 or 2030 for existing plants, depending on their size. With the average lifespan of a commercial boiler between 10-15 years, it pays to think carefully now about new capital equipment investment, to ensure that any boiler plant specified will be capable of meeting the new standard.

Unfortunately, heavy-fuel oil installations will not meet the new ELVs for SO2 or particulates without abatement. This may make some operators more cautious about investing in oil-fired technologies.

Switching to liquefied natural gas (LNG) or liquefied petroleum gas (LPG) can enable operators to ensure their installation meets the demands of the MCPD. Both fuels already meet standards for SO2 and NOX and particulate emissions as well as offering reduced CO2 output, with margin to handle some tightening of ELVs in the future.

Burning gas emits less CO2 in comparison to some oil types, with LNG being the cleanest burning of all fossil fuels available off-grid, offering a further step change in carbon reductions.

These clean burning properties also enable improved boiler efficiencies, which can exceed 90 per cent as well as reduced maintenance, both of which contribute to long term reduction in operational costs.

One success story is C&D Foods, a premium dry pet food manufacturer, which has saved in excess of £50,000 and more than halved its CO2 emissions since converting its boiler fuel from oil to LPG from Calor.

LNG and LPG offer a cost-effective energy supply with cleaner-burning, lower carbon outputs to oil. With a mature market of boiler and burner technologies readily available, the fuels are ready and able to meet the challenging emissions limits of the MCPD – if and when they change in the future.

Featured News

Specification news
BAL launches new floating uncoupling mat  

BAL – market-leaders in full tiling solutions – are launching two new uncoupling...

Read More >>

Specification news
Environmental milestone for Forbo's Marmoleum

Forbo Flooring Systems has quantified the environmental impact of its 2.5mm...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Training by Wetherby Brochure

Training by Wetherby
By Wetherby Building Sy...

Download Now >>

Through coloured render & spar dash systems Brochure

Through coloured ren...
By Wetherby Building Sy...

Download Now >>

Thin coat render colour card Brochure

Thin coat render col...
By Wetherby Building Sy...

Download Now >>

Clay brick slip system Brochure

Clay brick slip syst...
By Wetherby Building Sy...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

New integrated flush bolt + drop seal from Lorient
New integrated flush bolt + drop seal from Lorient

LAS9010 is an innovative, slimline flush bolt that seamlessly integrates with our most popular drop...

Read More >>

NEW LAS8014 si - high performance acoustic drop seal
NEW LAS8014 si - high performance acoustic drop seal

The latest addition to the Lorient Architectural Seals range is the LAS8014 si – a heavy-duty drop...

Read More >>

Sika Concrete Repair System Supports Refurbishment Of Town Centre Bridge
Sika Concrete Repair System Supports Refurbishment Of Town Centre Bridge

Sika supplied the concrete repair and corrosion management system as part of urgent refurbishment...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Reflex-Rol  video / Shading Solutions
Reflex-Rol video / Shading Solutions

De Leeuw Ltd / U.K. corporate video showing various specialised Solar shading / sunblind...

Watch Now >>

DE LEEUW LTD corporate video / Shading Solutions
DE LEEUW LTD corporate video / Shading Solutions

De Leeuw Ltd / U.K. corporate video showing various specialised Solar shading / sunblind...

Watch Now >>

Winners and mentions for the Archizinc Trophy 2018
Winners and mentions for the Archizinc Trophy 2018

Winners and mentions for the Archizinc Trophy 2018

Watch Now >>