Temporary sports complex wins top marks

Hotel, Sport & Leisure Wed, Mar 23, 2016 9:12 AM

Temporary sports complex wins top marks

A TEMPORARY sports complex has been awarded top marks after opening its doors to students for the first time.

The University of Nottingham is replacing its existing facilities with a £40 million state-of-the-art sports centre.

And temporary building experts Spaciotempo were called in to provide an interim solution while the building work, expected to last two years, is carried out.

The high-tech complex is made up of more than 3,000 square metres of bespoke structures, but the project, including planning and groundworks, was completed in just five months.

Dan Tilley, Director of Sport at the University, is delighted with the buildings, which opened for the first time last month.

He said: “The temporary complex represents the first stage in what is a huge project for us and I’m sure it will provide a sound interim solution.

“Spaciotempo came up with a plan that followed our brief and they’ve showed a positive, flexible attitude throughout.

“They also provided an all-encompassing service, which was a massive bonus for us.

“It meant we were able to delegate the entire project to them and have now simply taken delivery of the keys.”

The £2 million University Park project represents Spaciotempo’s biggest value single contract to date.

Managing director Scott Jameson said: “We managed the entire project, which involved a lot of ground work and the installation of several sports buildings.

“We put in all the drainage and provided the framework, flooring and electrical equipment including the heating and fixtures and fittings.

“It was a big task, but it was completed right on schedule.”

The temporary buildings feature a 12-court sports hall and a gym along with three squash courts and two dance studios with sprung floors.

The custom-built development, expected to open in September 2016, will replace the University Park sports centre, originally built in 1969.

Featured News

Specification news
Knauf Insulation’s sustainability credentials hit the...

Manchester is known for its rich cultural heritage, but now Co-op Live, the UK’s...

Read More >>

Specification news
Gatic Ultraslot meets rigorous drainage demands at...

The new Jorge Chávez Airport in Peru is one of the most pioneering airport projects...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Retirement & Care Brochure

Retirement & Care
By AKW

Download Now >>

Kitchens Brochure

Kitchens
By AKW

Download Now >>

Colorcoat HPS200 Ultra super durable case studies Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Confidex® Guarantee datasheet Brochure

Confidex® Guarantee...
By Tata Steel

Download Now >>

Colorcoat Prisma® colour card Brochure

Colorcoat Prisma® co...
By Tata Steel

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

RAPIDFIT OFF-THE-SHELF CUBICLES
RAPIDFIT OFF-THE-SHELF CUBICLES

RapidFit range offers a quick and efficient solution for commercial washroom projects that require...

Read More >>

Washroom Cubicles
Washroom Cubicles

Washroom Cubicles to meet all needsRearo offers a range of stylish, functional, and durable washroom...

Read More >>

ParallelRoof 100
ParallelRoof 100

ParallelRoof 100 is a non-insulated conservatory system that provides the perfect solution for any...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>