New planning requirements on fire safety come into force

Latest News Tue, Aug 3, 2021 8:53 AM

New planning requirements that come into force this week, known as planning gateway one, which will ensure that high-rise developments consider fire safety at the earliest stages of planning.

Developments involving high-rise residential buildings must demonstrate they have been designed with fire safety in mind before planning permission is granted – including through their site layout – and with access provided for fire engines.

This information will be submitted as part of the planning application in a fire statement.

Housing Minister Rt Hon Christopher Pincher MP said: “This is a key step in our progress towards a new, risk-based building safety regime that will ensure fire safety is prioritised at every stage in the development of high-rise buildings.

“I am pleased to appoint the Health and Safety Executive as the statutory consultee, which will be on-hand to provide their expertise to local planning authorities on these important fire safety elements.

“We are driving up the standards of safety for people’s homes and our new regulator – to be introduced under the Building Safety Bill – will provide this essential oversight, from a building’s initial design, to providing homes in the future.”

Local planning authorities must seek specialist advice on relevant applications from the Health and Safety Executive (HSE), as the statutory consultee on fire safety, before a decision is made on the application.

In future, this role is likely to become part of the new Building Safety Regulator – which, led by HSE, will oversee a new safety regime for high-rise residential homes.

Peter Baker, Chief Inspector of Buildings, at Health and Safety Executive said: “The introduction of planning gateway one is an important milestone in the journey to radically reform building safety so that residents are safe, and feel safe, in their homes.  

“It will ensure that fire safety is considered from the very beginning of a building’s life and that developments benefit from integrated thinking on fire safety.”

The Health and Safety Executive is now a statutory consultee for planning applications involving relevant high-rise residential buildings and will apply risk-based fire safety knowledge and expertise to evaluate planning applications. This will enable local planning authorities to make sound and informed decisions.

The changes to planning requirements follow a key recommendation made by Dame Judith Hackitt that fire safety in high-rise buildings should be considered at the earliest possible stage in the planning process, as set out in her panel’s independent Review of Building Regulations and Fire Safety.

It marks one of the first steps in the government’s major overhaul of building safety regulation. On 5 July 2021 the Housing Secretary introduced the Building Safety Bill that will set a clear pathway for improved standards on how residential buildings should be constructed and maintained.

Featured News

Specification news
Leviat, Siderise and Ibstock unite for high-rise...

Photo: Jonathan Vaughan, Technical Manager – Masonry, LeviatLeviat, a world leader...

Read More >>

Specification news
ALTRO BRINGS IMMERSIVE WELLBING EXPERIENCE TO...

Visit Altro’s showroom during Clerkenwell Design Week and you’ll find it...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>