Latest News Mon, Nov 9, 2026 6:55 AM
The Building Safety Regulator’s (BSR) latest data for the 12-week rolling period to 1 November 2026 shows overall gateway 2 application approvals rising to 92%, with 19,409 residential units clearing the gateway.
New HRBs and conversion approvals stood at 95% nationally and 97% in London, with existing building remediation approvals climbed to 93% nationally and to 98% in London.

Highlights to 1 November 2026 (12 week rolling period):
BSR continues to drive improvements regarding the assessment of applications for new high-rise residential buildings and major conversions.
Over the latest rolling period, BSR made 42 decisions on new-build projects, approving 95% of applications (40 approvals) with a median approval time of 20 weeks.
These approved schemes represent 9,453 new residential units. In November 2025, overall remediation decision times stood at 44 weeks with an approval rate of 32%, highlighting substantial progress.
Data shows an increasing number of new-build projects progressing through gateway 2, with 24,689 homes under construction and a further 24, 833 approved, but yet to start on site.
Most new-build activity continues to take place in London, which accounted for 30 of 42 national decisions made.
BSR approved 29 of these 30 projects in London. This represents an approval rate of 97% in the capital and unlocked 6,733 residential units. The median determination time in the capital was 20 weeks for non-complex cases.
Nationally, BSR is managing 183 live new-build and conversion applications (39,843 units).
Charlie Pugsley, Acting Chief Executive Officer of the Building Safety Regulator, said: “Our latest data reflects continued momentum and growing maturity across the regulatory regime.
“Overall Gateway 2 approvals have reached 92%, unlocking 19,409 residential units, with remediation approvals climbing to 93% nationally and 98% in London.
“While we continue to streamline determination times for high-quality applications, safe homes require high-quality applications and robust but proportionate regulation.
“Through our expanding site inspection programme and multi-disciplinary workforce, we are focussed on ensuring adherence to approved designs during construction.
“Coupled with our structured handling of the recent pre-levy surge, BSR is determined to maintain rigorous scrutiny at every stage.
“Our core objective remains unchanged – driving accountability across the sector to guarantee that residents are safe, and feel safe, in their homes.”
Featured News
UK construction companies signalled a sharp and accelerated reduction in business...
Skills shortages are limiting the surveying profession’s capacity to meet demand,...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
CemGold
By IPP
Mada ProGuard
By IPP
Scandinavian Furnitu...
By BJELIN
Fire Rated Loft Ladd...
By Premier Loft Ladders...
Flooring Collection...
By Gerflor
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...
Magply recovery and protection boards have been developed to meet the roofing industry needs for a...
Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...
Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...
This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...