Aintree's urgent care and trauma centre completes

Health Wed, Mar 23, 2016 9:14 AM

Aintree's urgent care and trauma centre completes

Aintree Hospital’s new Urgent Care and Trauma Centre has been officially opened and is starting to receive and care for its first patients.

Phase one of a £35million three-phase redevelopment designed by architects and planners IBI Group, this high quality facility provides the hospital with an interim state emergency department, together with majors, trauma, high care unit, CT scanning and support facilities.

“Working closely with the Trust, our shared design focus has been to ensure that all patients, some of whom are critically ill, receive the best possible care in a modern, purpose built environment,” said IBI’s Oliver Veitch-Smith. “The spacious new facility will enhance efficiency and service quality, enabling all clinical staff to treat patients and their families more effectively and with greater privacy and dignity.”

Phase two which finishes in August 2016 will permanently reprovide the emergency department on the ground floor, including an observation ward and minor treatment unit. These areas will also include a café, waiting, triage and ‘see and treat’ facilities.

Phase three is due for completion in November 2016 and will refurbish the interim state emergency department into a new 24-bed critical care unit.  

Paul Fitzpatrick, Director of Estates and Facilities at Aintree University Hospital said: “The new state of the art facilities will ensure that Liverpool and Cheshire will continue to have the best trauma outcomes outside London by ensuring staff have the best possible environment to work in.”

Upon completion, the overall scheme will transform the hospital’s emergency and urgent care services; creating the most modern Emergency Department in the region and offering state-of-the-art facilities for patients.

Featured News

Specification news
Mapetherm System repairs & protects external surfaces...

A Mapetherm System has been used to complete an external surface refurbishment at...

Read More >>

Specification news
Altro adhesive-free floors support new hospital...

Altro Wood adhesive-free safety flooring has brought natural, biophilic design to...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Retirement & Care Brochure

Retirement & Care
By AKW

Download Now >>

Kitchens Brochure

Kitchens
By AKW

Download Now >>

Colorcoat HPS200 Ultra super durable case studies Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Confidex® Guarantee datasheet Brochure

Confidex® Guarantee...
By Tata Steel

Download Now >>

Colorcoat Prisma® colour card Brochure

Colorcoat Prisma® co...
By Tata Steel

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

ParallelRoof 100
ParallelRoof 100

ParallelRoof 100 is a non-insulated conservatory system that provides the perfect solution for any...

Read More >>

MasterLine 8 Heritage Window and Door System
MasterLine 8 Heritage Window and Door System

MasterLine 8 is a high-specification, next-generation window and door system that delivers...

Read More >>

ConceptSystem 77 Heritage Window and Door System
ConceptSystem 77 Heritage Window and Door System

The ConceptSystem 77 system incorporates a comprehensive range of inward- and outward-opening window...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>