Aintree's urgent care and trauma centre completes

Health Wed, Mar 23, 2016 9:14 AM

Aintree's urgent care and trauma centre completes

Aintree Hospital’s new Urgent Care and Trauma Centre has been officially opened and is starting to receive and care for its first patients.

Phase one of a £35million three-phase redevelopment designed by architects and planners IBI Group, this high quality facility provides the hospital with an interim state emergency department, together with majors, trauma, high care unit, CT scanning and support facilities.

“Working closely with the Trust, our shared design focus has been to ensure that all patients, some of whom are critically ill, receive the best possible care in a modern, purpose built environment,” said IBI’s Oliver Veitch-Smith. “The spacious new facility will enhance efficiency and service quality, enabling all clinical staff to treat patients and their families more effectively and with greater privacy and dignity.”

Phase two which finishes in August 2016 will permanently reprovide the emergency department on the ground floor, including an observation ward and minor treatment unit. These areas will also include a café, waiting, triage and ‘see and treat’ facilities.

Phase three is due for completion in November 2016 and will refurbish the interim state emergency department into a new 24-bed critical care unit.  

Paul Fitzpatrick, Director of Estates and Facilities at Aintree University Hospital said: “The new state of the art facilities will ensure that Liverpool and Cheshire will continue to have the best trauma outcomes outside London by ensuring staff have the best possible environment to work in.”

Upon completion, the overall scheme will transform the hospital’s emergency and urgent care services; creating the most modern Emergency Department in the region and offering state-of-the-art facilities for patients.

Featured News

Specification news
A clear upgrade for AMC Hospital with Pyroguard’s...

AMC Hospital, which is the largest healthcare facility in the Netherlands, has...

Read More >>

Specification news
Leak Resistant Wet Rooms Whether Upstairs or Down

Over 10 million people in the UK are aged 65+ and this figure is set to grow.[i] Add...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

PVC-U System Fully Reversible Windows by Epwin Window Systems Brochure

PVC-U System Fully R...
By Epwin window systems...

Download Now >>

Spectus Bevelled Windows and Doors Brochure

Spectus Bevelled Win...
By Epwin window systems...

Download Now >>

Vertical Sliding Sash Window Brochure

Vertical Sliding Sas...
By Epwin window systems...

Download Now >>

Two-Part Cill System Brochure

Two-Part Cill System
By Epwin window systems...

Download Now >>

 Spectus Ovolo  Windows and Doors Brochure

Spectus Ovolo Wind...
By Epwin window systems...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

DUOFLEX
DUOFLEX

DUOFLEX is a high quality elastomeric bitumen, hot bonded to the substrate incorporating the fleece...

Read More >>

TECSOUND
TECSOUND

TECSOUND is a polymer based, bitumen-free, high-density synthetic membrane. The combination of its...

Read More >>

ISOLAIR MULTI
ISOLAIR MULTI

ISOLAIR MULTI is a natural and ecological vapour-permeable, windproof and water-repellent thermal...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

A responsible addition: HIMACS shapes are now SCS-Certified for recycled content
A responsible addition: HIMACS shapes are now SCS-Certified for recycled content

HIMACS has long been the solid surface material of choice for architects and designers looking for a...

Watch Now >>

Our SUSTAINABILITY Roadmap
Our SUSTAINABILITY Roadmap

Myson has a clear sustainability strategy in line with the UN Sustainable Development Goals (SDGs)...

Watch Now >>

Sustainable Energy Efficient Solutions
Sustainable Energy Efficient Solutions

From radiators and underfloor heating to ceiling convectors and towel warmers, Myson is the UK’s...

Watch Now >>