Balfour Beatty tops out Chamberlain Student Residence

Public Sector Wed, Mar 23, 2016 9:11 AM

Balfour Beatty tops out Chamberlain Student Residence

Balfour Beatty has been joined by its customer, the University of Birmingham, for the topping out of the 21-storey Chamberlain Student Residence which has reached its highest point of construction, ahead of opening its doors to students this autumn.

Friends and neighbours of the University were among guests who travelled to the roof of the building in Edgbaston to see Vice-Chancellor, Professor Sir David Eastwood, lay the final area of concrete at the top.

Balfour Beatty is delivering the project in just 103 weeks by utilising BIM (building information modelling) for the planning and value-engineering of the project and the expertise of Balfour Beatty Engineering Services and its Modular Systems+ facility in Wednesbury to provide bespoke pre-fabricated modular mechanical and electrical units housing ducting, cabling and pipe-work for the building. These can be installed quickly on-site further reducing the construction time.

The building will meet the highest government-approved EPC ‘A’ category for energy efficiency through the use of brick cladding for insulation, a CHP (combined heat and power) plant, LED lighting, a copper rainscreen and glazed curtain walling to reduce heat loss.

The building, which rises around 75m from ground level, will be home to more than 700 first year students at the university from this September, replacing the previous Eden Tower which closed in 2006.

Lesley Stewart, Director of Residential and Environmental Services at the university, said: “We have an on-going commitment to invest in our accommodation stock to ensure that students coming to Birmingham have outstanding homes to live in, to get their university lives off to a flying start.

“The redevelopment of Chamberlain is the latest project to come to fruition after many years of hard work to get it to this stage and I am delighted that we have reached this important point. The tower looks wonderful and I look forward to welcoming the first residents of the new Chamberlain this autumn.”

Colin Harper, Balfour Beatty Project Director, said: “Today marks an important milestone in the construction of the new Chamberlain student residences. We look forward to continuing to work with the University of Birmingham and local community to deliver this state-of-the-art residence for students.”

Also at the ceremony was third year civil engineering student George Bence. George recently completed a placement on site for Balfour Beatty at Chamberlain Halls, giving him valuable real-life experience of working on a construction site.

He said: “On day one I realised I had no idea how a site worked. Now, thanks to the brilliant team I worked with on site, I am able to make a positive contribution. Having watched construction begin, and the tower rise out of the ground, it’s great to see it reach this milestone.”

Featured News

Specification news
ASSA ABLOY launches new DC850 and DC870 concealed door...

ASSA ABLOY has unveiled its new DC850 and DC870 concealed cam-motion door closers,...

Read More >>

Specification news
TORMAX IP65 & IP68 - automatic door drives for any...

Setting a new standard for hygiene, reliability, and durability, TORMAX introduces a...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Mada ProGuard Brochure Brochure

Mada ProGuard Brochu...
By Magply

Download Now >>

 FIREscape+ Range Overview Brochure

FIREscape+ Range Ov...
By Hochiki Europe (UK)...

Download Now >>

Master Catalogue Brochure

Master Catalogue
By F.H. Brundle

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

GYPSOTECH® EXTERNA LIGHT Cement board
GYPSOTECH® EXTERNA LIGHT Cement board

Lightweight fibreglass-reinforced cement board, designed to be applied both on the inside and...

Read More >>

Cedral Birkdale
Cedral Birkdale

Cedral - Birkdale fibre cement slate has a smooth surface and dressed edges. It offers a traditional...

Read More >>

Cedral Thrutone Smooth
Cedral Thrutone Smooth

Cedral - Thrutone Smooth are a low-profile fibre cement slate that features a smooth surface and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>