Design shortlist announced for new HQ for the Metropolitan Police Service

Regeneration Tue, Mar 22, 2016 5:21 PM

Design shortlist announced for new HQ for the Metropolitan Police Service

The Royal Institute of British Architects (RIBA), the Mayor’s Office for Policing and Crime (MOPAC) and the Metropolitan Police Service (MPS) has announced the shortlist for the design competition to create a new central London HQ - replacing their existing New Scotland Yard building.

The competition received an excellent response and the shortlisted teams selected (in alphabetical order) are:

  • Allford Hall Monaghan Morris
  • Allies and Morrison
  • Foster and Partners
  • Keith Williams Architects
  • Lifschutz Davidson Sandilands

Roger Harding MPS - Director of Real Estate Development said: “The competition generated considerable interest with the chance to create a new landmark building for London.

"We would like to offer our sincere thanks to the world class field of national and international award-winning practices who submitted expressions of interest. The selection process was exceptionally difficult but we are delighted to have five such high quality architects on our shortlist for this important building.

“The move to Curtis Green is an exciting opportunity for the MPS to create a modern and efficient working environment within this new headquarters.  We look forward to seeing a winning design that respects the history of the building whilst reflecting the MPS need to modernise our estate.”

The new HQ, to be called Scotland Yard, will involve the redevelopment of the existing and currently unoccupied Curtis Green MPS building located on the Victoria Embankment, London, SW1.  

The Curtis Green Building, named after architect William Curtis Green, sits within the Whitehall Conservation Area between the Norman Shaw Building and the Ministry of Defence.  It faces onto the Victoria Embankment with views across the River Thames to London County Hall, Westminster Bridge and the London Eye.

The shortlisted teams will now work on their design proposals and will be invited to present these to the judging panel in September 2013.

Featured News

Specification news
Light throughout – divide space with glass Skyfold...

Companies looking to divide room space while maximising light should consider the...

Read More >>

Specification news
Promat provides fire resistant glazing solutions for...

Fire resistant glazing and fire-rated glass door-sets manufactured by Promat UK have...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>