Regeneration Tue, Mar 22, 2016 5:18 PM
Civil and structural engineering consultancy JPG has completed works on two new state of the art office buildings at Daresbury Park near Warrington on behalf of client Marshall CDP.
The two buildings within Cinnabar Court, which is the latest speculative phase on the 225 acre site, have been pre let to Diocese of Chester and Gene Health occupying 10,000 sq ft and 14,000 sq ft respectively.
JPG consulted on the structural components of the high specification buildings as well as the creation of new infrastructure, such as roads and drainage, to support the needs of the development.
Chris Harding, Director at JPG said: “The introduction of such diverse end uses onto the park have brought an interesting conclusion to this phase of development. The site had been re-profiled, associated with earlier phases of development and thus, the foundation strata required very precise investigation and interpretation prior to selecting the most appropriate foundation solution.”
Located adjacent to Junction 11 of the M56 motorway Daresbury Park is one of the largest business parks in the North West and has been designated as a key strategic site by the North West Development Agency. The Park has planning consent for 1.6 million sq ft of development and has already attracted a host of blue chip occupiers including BNFL, De Vere Group and HS Administrative Services.
Architects Building Management Services designed the buildings whilst Marshalls Construction (West Yorkshire) Ltd delivered them.
Featured News
Operations Director for Associated Steel Window Services (ASWS), Kris Bennell,...
Howells Patent Glazing has returned to Northallerton institution, Barkers to replace...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
2026 Product Brochur...
By The Radiator Compan...
System for Laying Fl...
By FassaFloor
Training for Excelle...
By Aico
The Connected Home S...
By Aico
Safety First, Aico F...
By Aico
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Partition wall systems made of glass allow transparent room partition. They open, divide and...
Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...
Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...