High performance glazing keep passengers safe

Public Sector Fri, Jul 8, 2022 1:23 PM

Almost four kilometres of glazed platform edge screening has been installed across central London’s Elizabeth line stations, keeping passengers safe with the final segment of the landmark rail project now open.

St Helens headquartered glass manufacturer Pilkington UK supplied 5,000 glass panels to Knorr-Bremse Rail Systems UK, which manufactured and installed floor-to-ceiling platform screen and door systems – creating a transparent safety barrier between the platform edge and the track.

The glazed barriers feature on both the 240-metre-long eastbound and westbound platforms at the Paddington, Bond Street, Woolwich, Canary Wharf, Tottenham Court Road, Farringdon, Liverpool Street and Whitechapel stations.

Photo: Grant Pritchard

The glazing comprises two pieces of advanced toughened glass, based on the technology that underpins the Pilkington Pyroclear range - addressing the current risk requirements including barrier safety and blast resistance.

Kristian Chalmers, head of sales at Pilkington UK, said: “We’re proud to be one of the many suppliers from across the UK’s nations and regions that have helped Crossrail to become a reality.

“Naturally, a project like this commands the specification of high-performance materials that can withstand very high traffic while meeting critical safety requirements.

“Knorr-Bremse chose to work with us on the project for the Elizabeth line due to the strength and quality of the Pilkington Pyroclear product technology, and our ability to meet both a demanding technical brief and a complex programme. The glass is an ideal choice for projects with safety and security standards as high as this. This is reflected by the fact that we now have products listed in the London Underground approved product directory.”

The Elizabeth line will serve 41 accessible stations, 31 of them upgraded, including all three terminal rail stations at Heathrow and services to Reading. It will boost central London’s rail capacity by 10 per cent, bringing an additional 1.5 million people within 45 minutes’ commute of central London.


Photo: Crossrail Ltd

Featured News

Specification news
Sto’s EWI system and high-performance façade paint...

A new state-of-the-art business incubation building in Dorset has been completed with...

Read More >>

Specification news
Railway DDA Handrails with LED Lighting – Stargard

Stargard is not simply a DDA handrail with a powder coated finish. Stargard is a true...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Speedpanel A2 Aluminium Fire Certificate  Brochure

Speedpanel A2 Alumin...
By Speedpanel

Download Now >>

Speedpanel A2 Glass Fire Certificate Brochure

Speedpanel A2 Glass...
By Speedpanel

Download Now >>

Speedpanel Typical Detail Sketch Brochure

Speedpanel Typical D...
By Speedpanel

Download Now >>

The Speedpanel Brochure Brochure

The Speedpanel Broch...
By Speedpanel

Download Now >>

Speedpanel A2 Aluminium Datasheet  Brochure

Speedpanel A2 Alumin...
By Speedpanel

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Speedpanel A2® Aluminium
Speedpanel A2® Aluminium

Speedpanel A2® Aluminium Easy to install, aluminium spandrel panels have the added advantage of a...

Read More >>

 Speedpanel A2® Glass
Speedpanel A2® Glass

Speedpanel A2® Glass Designed to be simply glazed-in to curtain walling systems, Speedpanel A2®...

Read More >>

Thermo-loc FR60 60 Minute Fire-Rated Cavity Closer
Thermo-loc FR60 60 Minute Fire-Rated Cavity Closer

60-minute fire-rated cavity closer for eliminating damp and cold bridging around doors, windows, and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Introducing Livenza Plus
Introducing Livenza Plus

The new sanitaryware range from AKW

Watch Now >>

Rise & Fall Bidet
Rise & Fall Bidet

Kate Sheehan takes us through the new AKW rise and fall bidet range from an occupational therapist's...

Watch Now >>