Councils cannot afford to carry out work on high rises

Public Sector Fri, Aug 18, 2017 11:21 AM

Councils with a combination of ACM cladding and insulation on their high-rise blocks have already taken steps and put in measures to reassure residents about safety.

Responding to the latest fire safety test result on cladding and insulation announced, Cllr Simon Blackburn, Chair of the Local Government Association’s Safer and Stronger Communities Board, said: “Councils with a combination of ACM cladding and insulation on their high-rise blocks have already taken steps and put in measures to reassure residents about safety.

"It is important that the testing process is now moving towards identifying what materials landlords should be replacing these systems with.

“We are talking to the councils affected about the costs they now face to remove and replace cladding and insulation systems on their high-rise blocks.

“With test fails affecting buildings owned by a range of different landlords across the country, it is clear that the current building regulation system has failed. It is also clear that councils cannot afford to carry out this work.

“As a result, we remain firmly of the view that the Government needs to meet the exceptional cost to councils of removing and replacing cladding and insulation on high-rise blocks.

“Councils want to ensure all residents in their local area are safe in their homes, regardless of whether they own the block or not. There are concerns that other landlords in some areas are not acting as quickly to inform residents about test fails and lack the urgency shown by councils to identify their buildings with the cladding and insulation systems which have failed tests so far and take steps to make them safe.

“We also continue to seek clarity from the Government about the powers available to councils to help encourage landlords to take such action.”

Featured News

Specification news
TORMAX IP65 & IP68 - automatic door drives for any...

Setting a new standard for hygiene, reliability, and durability, TORMAX introduces a...

Read More >>

Specification news
New outdoor sporting facility for Burgess Hill features...

The development, officially named The Arc, is a key element of the new community...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>