Home of the Northern Ireland parliament in Belfast, Stormont has recently undergone a major refurbishment, including a completely new plumbing and heating system that provides catering and washing facilities on a daily basis for over 1000 people. The building itself has changed little over the years (it was opened in 1932) and therefore presented an interesting design and installation challenge.

As a prominent public sector institution, renewable, low carbon energy had to be specified as a required element of the new building envelope. Although, in fact, the huge expanse of flat roof space, orientated north/south with minimal shading, lent itself ideally to solar thermal panel technology, the essential calculation of the maximum annual hot water demand, bearing in mind possible seasonal discrepancies (e.g. lower winter output), was critical. When it came to demonstrating the green credentials of the Northern Ireland Assembly, the hybrid system would not only have to deliver sufficient hot water but also give the expected return on an investment entirely funded from the public purse.

Being such a prestigious project, the stakes were high to deliver a cost-effective solution, on time and within budget. The partnership of leading renewables manufacturer, Kingspan Thermomax (part of Kingspan Environmental Ltd), mechanical consultancy Bennett Robertson Design and installation contractor, Dublin based Alternative Energy Ireland, provided all the necessary expertise and resource to design, specify and build a solar thermal hot water system that successfully met every project criterion. At the 2016 Action Renewables Association Awards, the Northern Ireland Assembly won first place as the best renewables installation within the Education, Healthcare and Public Sector.

Flexibility was a key requirement for the solar array solution because of the structural challenge presented by the 85-year-old flat roof. As the name ‘House on the Hill’ suggests, high winds had to be factored in because of the location of the building, meaning that solar panels were laid effectively flat, at 2° to the horizontal, as opposed to standing at the usual 35° angle to the roof. The compromise in energy output was deemed acceptable when set against potential wind damage to the collectors.

According to Finbarr McCarthy, Specification Design Manager at Kingspan Environmental “the Thermomax DF400 direct flow evacuated tube collector can be installed at inclinations as low as 2°, which makes it particularly suitable for installations where the aesthetics of a building might be negatively impacted by the presence of a standard inclined solar thermal collector array”. The actual height of the building required 40m of pipework, utilising an existing service shaft, to link the rooftop array with the plant room located in the basement. The 1000 litre calorifier was supplied pre-plumbed by Kingspan Thermomax, along with the controls pack.

“The Kingspan Thermomax team was delighted to work with such a progressive and innovative design practice like Bennett Robertson Design. They had very clear ideas as to their requirements for the solar thermal circuit. The detailed hydraulic and collector layout designs for this project ensured that all ancillary components were sized for maximum efficiency and effectiveness”, adds Finbarr.

A two stage installation and commissioning process took only two weeks, which, because of the extensive consultation period and design support from the Kingspan specification team, was problem free:

Managing Director of AEI, Steven Bray agrees that the project partnership had the right blend of know-how and innovation for this challenging installation that was under a lot of public scrutiny. “We always choose to work with Kingspan as we find the quality of the products are second to none plus the fact that their technical staff are involved with the project from initial specification right through to completion.” he says, adding “they are always available and able to deal with any question or on-site problem. Typically, you will find Kingspan Thermomax product being used on the more ‘interesting’ projects because of its flexibility and reliability”.

For further information visit www.kingspanthermomax.com or watch our YouTube video at https://www.youtube.com/watch?v=c5cXxXwLMdc

Featured News

Specification news
Abloy UK launches Aperio KL100 wireless cabinet lock

Abloy UK has launched the new Aperio KL100 – a battery powered wireless access...

Read More >>

Specification news
New Tessera Harmony range completes Forbo’s Tessera...

Forbo Flooring Systems is delighted to introduce Tessera Harmony – the third and...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

REVO.Prime TSA 325 NT Brochure

REVO.Prime TSA 325 N...
By GEZE UK Ltd

Download Now >>

Natural ventilation strategy for Sunderland SEND school Brochure

Natural ventilation...
By Passivent

Download Now >>

Squash Court Flooring Brochure

Squash Court Floorin...
By Junckers Limited

Download Now >>

Junckers Acoustics Floor System Brochure

Junckers Acoustics F...
By Junckers Limited

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Ei1025 Environmental Sensor
Ei1025 Environmental Sensor

Discreet and secure, the Ei1025 Environmental Sensor can be placed throughout a property to monitor...

Read More >>

Ei1000G SmartLINK Gateway
Ei1000G SmartLINK Gateway

The Gateway and Cloud portal use Aico’s SmartLINK technology to bring together data from all...

Read More >>

Ei3030 Multi-Sensor Fire and Carbon Monoxide Alarm
Ei3030 Multi-Sensor Fire and Carbon Monoxide Alarm

The Ei3030 is a multi-sensor Fire & Carbon Monoxide (CO) Alarm. Containing our proven and dependable...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Forma aluminium column casings for Winchester College
Forma aluminium column casings for Winchester College

In progressive and dynamic business sectors, such as construction, it’s natural to be forward...

Watch Now >>

Decorative metal bulkheads & column casings for Tesco Extra, Birmingham
Decorative metal bulkheads & column casings for Tesco Extra, Birmingham

Decorative aluminium horizontal bulkheads more than 100 metres long have been supplied and installed...

Watch Now >>

Vecta building linings for the perfect finish
Vecta building linings for the perfect finish

More than 150 sq.m of Vecta aluminium wall lining and a feature bulkhead have been manufactured and...

Watch Now >>