Wavin Tigris K1 goes to the top of the class

Public Sector Mon, May 23, 2016 12:55 PM

The Esker Education Together National School in Dublin was financed and constructed as part of the Department of Education and Skills’ Rapid Build Programme.

The two-storey build consisted of 16 classrooms, six support teaching classrooms, a hall, library, staff room, two ball courts, a play area and associated ancillary accommodation. Construction began on January 2 2014 and was completed within the planned 34-week timeline, in time for the start of the academic year in September 2014. More than 1,200m of Wavin Tigris K1 pipe was installed during a 16-week period.

This project was one of four new-build school contracts awarded to ABM Construction by the Department of Education and Skills’ Rapid Build Programme. The design and build consortium planned a fast-track on-site construction duration of just 34 weeks to ensure the two-storey school – with a total area of 2,524 sq m – was completed and operational in time for the start of the 2015/2016 academic year. A plumbing solution that was quick and easy to install, cost effective and reliable was required – leading contractors to specify Wavin Tigris K1.

A total of 1,200m of Wavin Tigris K1 pipe and associated fittings were installed on site. Sizes ranged from 16mm to 63mm. In the larger sizes, namely 50mm and 63mm, Metal Bodied Fittings were supplied to accommodate the connection of K1’s plastic fittings with brass fittings. As Wavin Tigris K1 is a press-fit system, it features a lightweight, safe installation method that allowed the plumbing, soil and waste installation works to be completed in just 16 weeks.

With the design and build consortium planning such a fast-track construction programme, speed of installation – without compromising performance – was of particular importance. Wavin Tigris K1 has been specially designed with such requirements in mind. The flexible pipe means fewer fittings and faster, lower cost installations. Its quick, safe and proven press-fit system means no hot works insurance – and no soldering, welding or thread cutting – is needed.

The patented hexagonal nose reduces push-in force and will hold 2m of pipe unpressed, so installers don’t need to hold the pipe in position. Furthermore, the defined-leak window and visual connection checks give installers the peace of mind that secure connections have been made every time. It is for this reason among others that Wavin offers a 10-year guarantee that covers not just product replacement but the costs incurred during the process of repairing any damages, plus personal injury and any third party damages. This is unrivalled in the industry.

“On successfully securing the contract our experienced contracts managers and project managers took a look at the time scale on the project and it was very quickly determined we needed to look at alternative products to speed up this installation," said Frank Lovett, Contracts Manager at Laurence Mechanical.

"Reviewing the products available on the market our contracts managers could clearly see the benefits and quality that the Wavin Tigris K1 system offered.

"All of our employees were demonstrated the product, and the feedback from our employees was extremely positive in relation to the ease of use and speed of installation. We would highly recommend this product to any prospective installers or project design teams, we found Wavin to be very helpful and they have always made themselves available to us if required.

"We have no doubt that Wavin Tigris K1 will become a market leader within the industry and its use will become common place, with same trusted quality Wavin products provide.”

Featured News

Specification news
Fully certified London Fire Brigade Locks now available...

Leading door hardware specialist Zoo Hardware has introduced a new range of London...

Read More >>

Specification news
The importance of tactile paving explained

For people with no visual impairments, tactile paving and its uses may go unnoticed....

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Novantica - Cement Free Restoration  Brochure

Novantica - Cement F...
By Fassa Bortolo

Download Now >>

Fassatherm System - Product Catalogue  Brochure

Fassatherm System -...
By Fassa Bortolo

Download Now >>

Fassarend System - Product Catalogue  Brochure

Fassarend System - P...
By Fassa Bortolo

Download Now >>

Fassalime System - Product Catalogue  Brochure

Fassalime System - P...
By Fassa Bortolo

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>