'Green' natural ventilation from SE Controls at new King's Cross Central development

Public Sector Wed, Mar 23, 2016 9:59 AM

'Green' natural ventilation from SE Controls at new King's Cross Central development

The London Borough of Camden’s new multi-storey office and leisure complex within the 67 acre King’s Cross Central development, is using a highly energy efficient natural ventilation system from SE Controls to maintain a comfortable indoor environment while contributing to the building’s BREEAM outstanding rating.

Working with contractors, Kier Construction, Weedon, as executive architects, developed the original design prepared by Bennett Associates for Camden Council’s new administrative HQ and customer services contact centre. Located at Five Pancras Square, the the 14-storey building not only provides 150,000 sq.ft of floor space but also incorporates a leisure centre, swimming pool, public library and café.

By using a combination of active and passive design features to obtain very low carbon emissions, such as low glazing ratios and energy efficient ventilation, the building achieves the highest standards of environmental sustainability for a major office building and is on course to reach the highest ever BREEAM score.

To maintain precise energy efficient control over the building’s indoor air quality and maintain a comfortable working environment, SE Controls supplied, installed and commissioned a natural ventilation system that fully automates and controls the opening of windows on the North and South elevations, as well as the main atrium space.

A total of 204 SCCO 24 30 concealed tandem and single chain actuators are installed on Schüco AWS 102 SK glazed projected top hung vents, which are controlled by 68 NVLogiQ 6Amp power supply units (PSUs) and actuated by the building’s central BMS, which also triggers window opening and closing for night purging.

Within the North atrium, SE Controls also installed 12 SECO N 24 40 twin chain actuators and a 30 Amp PSU panel, incorporating a maintenance key-switch and linked to the BMS, to provide additional control over ventilation, indoor air quality and building energy efficiency.

SE Controls’ Commercial Director, Martin Oates, explained: “With the continued move towards greater energy efficiency and sustainable building design, highly efficient natural ventilation systems, such as that incorporated within Five Pancras Square are delivering significant performance and running cost benefits to building owners, architect and occupants.”

He added: “In addition, the level of flexibility and precise environmental control they provide via advanced sensors and actuation systems enables indoor air quality parameters, such as carbon dioxide and temperature levels to be managed highly efficiently, allowing a comfortable and stimulating environment for staff and visitors to be maintained.”

SE Controls specialises in the design, project management and installation of advanced smoke ventilation and natural ventilation solutions to meet the needs of architects, contractors, building services engineers and facilities managers worldwide. Further information on SE Controls’ products, solutions and projects can be obtained by visiting www.secontrols.com or calling

+44 (0) 1543 443060.

In association with SE Controls


Quick Links


Company Details

Lancaster House
Wellington Crescent
Lichfield
Staffordshire
WS13 8RZ
United Kingdom
T: 01543 443060
View Website
  • Facebook
  • Twitter
  • Linkedin

Featured News

Specification news
Nakheel Mall

Nakheel Mall, Dubai’s 435,000 sq.metre retail and lifestyle centre located in the...

Read More >>

Specification news
SE Controls feels the power with Bristol’s...

Electricity House, Crest Nicholson Homes’ stylish city centre apartment development...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Maintenance Solutions  Brochure

Maintenance Solution...
By SE Controls

Download Now >>

SE Cloudlink Brochure

SE Cloudlink
By SE Controls

Download Now >>

Product Specification Guide Brochure

Product Specificatio...
By SE Controls

Download Now >>

Corporate Overview Brochure

Corporate Overview
By SE Controls

Download Now >>

Understanding Smoke Ventilation Compliance Brochure

Understanding Smoke...
By SE Controls

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Smoke Ventilation - End of wall corridor AOV
Smoke Ventilation - End of wall corridor AOV

If the corridor extends to the external wall an AOV can be installed to remove smoke from the common...

Read More >>

Smoke Ventilation- Escape Stair / Fire Fighting Stair
Smoke Ventilation- Escape Stair / Fire Fighting Stair

The prime objective of a smoke control strategy is to keep the escape stair free from smoke, by...

Read More >>

Smoke Ventilation- Mechanical Smoke Shaft
Smoke Ventilation- Mechanical Smoke Shaft

If a prescribed and certified solution is not a viable option for the building design a fire...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

SE Controls Overview
SE Controls Overview

This video is an overview of the comprehensive range of solutions provided by SE Controls for...

Watch Now >>