Bison steps up to energy from waste project

Public Sector Tue, Mar 22, 2016 5:20 PM

Bison steps up to energy from waste project

Bison Manufacturing Ltd, the UK’s leading precast concrete manufacturer, has supplied its market leading precast concrete stairs for the construction of a new multi-million pound renewable energy facility near Wolverhampton.
 
Working closely with SCWS Steel fabrications, the Bison team manufactured multiple bespoke precast stairs and landing units for installation at Staffordshire County Council’s new Energy Recovery Facility (ERF), which is being developed by Veolia Environmental Services in partnership with CNIM Clugston Staffordshire Ltd.
 
Bison’s fire resistant precast stairs and landings offer immediate access routes and minimal in-situ concrete, saving time and resource on site. They are suitable for use across a wide range of applications including hospitals, schools, offices, car parks, retail, multi residential developments and secure units.
 
Ian Burchnall, Contracts Manager at SCWS, the structural steelwork provider for the project, comments: “Having worked with Bison Manufacturing on previous projects we knew they could be relied upon to deliver high quality products to the timescales required. Their lifting hooks are particularly useful for being able to lift the products into position quickly, safely and accurately, which all helps towards the successful completion of the project.”
 
Mike Nelson, Commercial Manager at Bison Manufacturing, adds: “Working with SCWS from an early design stage, we utilised our manufacturing capabilities to create cost-effective, very high quality precast stairs and landings which met the project’s exact requirements. While the fact that it is a renewable energy site highlights the many sectors that our precast concrete products lend themselves to.”
 
One of Staffordshire County Council’s most ambitious projects to date, the Staffordshire Energy Recovery Facility will divert up to 300,000 tonnes of household waste from landfill, which cannot be recycled or composted, generating enough electricity to power 32,000 homes. It is anticipated that the construction of the facility will be completed by December 2013.

Featured News

Specification news
Forbo expands design possibilities with new Tessera...

Forbo Flooring Systems has enhanced its established Tessera carpet tile collection...

Read More >>

Specification news
Pilkington OptiView protects new collections at museum

Following a £15 million transformation last year, Manchester Museum introduced two...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Novantica - Cement Free Restoration  Brochure

Novantica - Cement F...
By Fassa Bortolo

Download Now >>

Fassatherm System - Product Catalogue  Brochure

Fassatherm System -...
By Fassa Bortolo

Download Now >>

Fassarend System - Product Catalogue  Brochure

Fassarend System - P...
By Fassa Bortolo

Download Now >>

Fassalime System - Product Catalogue  Brochure

Fassalime System - P...
By Fassa Bortolo

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>