Balfour Beatty hands over main viaduct structure at Reading

Public Sector Tue, Mar 22, 2016 5:38 PM

Balfour Beatty hands over main viaduct structure at Reading

The Balfour Beatty project team has handed over the main viaduct structure at Reading to Network Rail and Carillion, ready for track installation.

Reading Viaduct forms part of Network Rail’s £895 million redevelopment of the railway in Reading.

This handover is the third of five sectional milestones on the £45 million viaduct scheme. There are two remaining: the handover of the Feeder Line in October 2014 and the handover of the Festival Line in January 2015.

When the lines become operational in 2015, the new viaduct will ease rail congestion by enabling high speed trains (HSTs) that run on the Great Western Main Line to travel over the freight lines and straight into the station.  

It will also enable Cross Country trains to travel over the freight lines independently of the HSTs so the different train operators will be able to manoeuvre in and out of the Reading area freely and without impeding each other. This is an operating achievement that has not been addressed since Brunel built the first layout in the 1840s, allowing faster passenger services to and from the south west of England.

William Smith, Balfour Beatty Project Director, said: “The achievement of this important milestone is a result of the collaborative efforts of the Network Rail, Carillion and Balfour Beatty team. Working to complete this project safely and to programme would have been more difficult if it were not for the strong collaborative mind-set from everyone involved.”

In line with the company’s commitment to sustainability, Balfour Beatty recycled the majority of materials generated from the site, diverting over 90% of waste from landfill.

With over 400 people working on the project at its peak, Balfour Beatty has worked in partnership with Network Rail and Carillion to ensure this milestone was achieved and this vital rail infrastructure project remains on course for its 2015 completion.

Featured News

Specification news
Adhesive free carpet tiles help meet sustainability...

When offices within Lancashire Business Park were in need of refurbishment, Wrennalls...

Read More >>

Specification news
Expanding into the future

Vanquish Hardware Protection, the UK’s leading manufacturer of precision-engineered...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>