Skanska scales annual league summit for first time

Hotel, Sport & Leisure Wed, Mar 23, 2016 9:10 AM

Skanska scales annual league summit for first time

A series of high profile contract wins has helped Skanska reach the top of Glenigan’s annual contractor league table for the first time.

The contractor brought Kier and Balfour Beatty’s 20-month reign over the annual leagues to an end after securing five deals worth £411 million in February.

Recent successes include a £330 million contract for the construction management of AstraZeneca’s new corporate headquarters in Cambridge (Glenigan Project ID: 13094658). Skanska’s total annual haul also includes a £600 million contract for phase two of the Battersea Power Station regeneration scheme (Glenigan Project ID: 13109360).

Laing O’Rourke took pole position in the monthly league table after bagging the £440 million Westgate Oxford project for joint clients Land Securities and Crown Estates (Glenigan Project ID: 00296266) and an £80 million office scheme for Mosley Street Ventures in Manchester (Glenigan Project ID: 13159975).

Morgan Sindall climbed to third place, buoyed by a £80 million contract to build 600 homes for Kings Lynn and West Norfolk Borough Council (Glenigan Project ID: 14394210) and a £30 million student services centre for Cambridge University (Glenigan Project ID: 14262446).

AstraZeneca’s Cambridge Biomedical Campus project has seen it shoot straight to the top of the latest monthly client table. The development, which will include a global research and development centre, is expected to complete in 2016/17.

Elsewhere in this month’s contractor leagues, Aecom is a new entry at the top of the quantity surveyor table after winning seven deals worth £544.5 million. Hoare Lee climbed six places to take the number one spot in the consulting engineers tables, while Dixon Jones leads the list of top 20 architects.

Glenigan league tables are produced from comprehensive UK construction activity data and provide a snapshot of contractor performance over a 12-month period. Projects are tracked to completion on site by Glenigan researchers, who make over one million phone calls per year to provide timely, robust data.

Featured News

Specification news
Sika breathes new life into historical building

A Grade II listed property in Aberdare, Wales, has received a new lease of life with...

Read More >>

Specification news
Brett Martin spans Center Parcs’ subtropical swimming...

Brett Martin’s Marvault rooflights have been installed as part of a...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>