Hotel, Sport & Leisure Tue, Mar 22, 2016 5:02 PM
A Welsh-based specialist building systems company are celebrating a job well done as competitors start to move out of the Athletes’ Village at the London 2012 Olympic Park.
MIB Framespace Structures supplied 1,800m2 of their MetSIP infill panel for use across 12 floors between a concrete structure.
The panels were manufactured off-site at MIB's own 28,000sq.ft factory at Blaina.
Colin McKenzie, founder and chairman of the MIB Group, said: “Working closely with our client EJ Horrocks, we were able to meet the environmental standards required and strict delivery timetable thanks to the control that having your own in-house design and manufacturing set-up brings.”
The Olympic Village has residential apartments for around 17,000 athletes and officials during the Games, along with shops, restaurants, medical, media and leisure facilities, and large areas of open space.
There are 11 residential plots, each made up of five to seven blocks built around communal squares and courtyards, with water features accentuating the closeness of the River Lea.
After the Games, the Olympic Village will be a lasting legacy of essential new housing for east London. It will be transformed into 2,818 new homes, including 1,379 affordable homes and houses for sale and rent, and will create a new residential quarter to be known as East Village.
The communities that develop in the area after the Games will be supported by new parklands, open space, new transport links and community facilities. These will include Chobham Academy – a world-class new education campus with 1,800 places for students aged 3–19 – and a new health centre, which will provide medical facilities to existing local communities and the residents of the Village after 2012.
The accommodation will range from one bedroom apartments up to four- and five-bedroom townhouses. Temporary partitions needed during the Games will be removed to form the final living spaces and bedrooms. Kitchens will be installed, along with new carpets or timber floors.
Featured News
A traditional hotel in Blackpool has been transformed into nine bespoke luxury...
In the demanding world of commercial construction and renovation, where deadlines are...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Retirement & Care
By AKW
Kitchens
By AKW
Colorcoat HPS200 Ult...
By Tata Steel
Confidex® Guarantee...
By Tata Steel
Colorcoat Prisma® co...
By Tata Steel
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
RapidFit range offers a quick and efficient solution for commercial washroom projects that require...
Washroom Cubicles to meet all needsRearo offers a range of stylish, functional, and durable washroom...
ParallelRoof 100 is a non-insulated conservatory system that provides the perfect solution for any...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...
https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....
A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...