Health Tue, Mar 22, 2016 5:39 PM
The construction of a brand new £12 million Cancer Centre has begun on the Queen Mary’s Hospital in Sidcup.
Designed by architects IBI Group, when built the new oncology centre will provide patients with a local, convenient, high quality service run by staff from Guy’s and St Thomas’ NHS Foundation Trust.
It will provide radiotherapy and chemotherapy treatment, as well as an information and advice service for patients and their families.
“Currently, patients who require radio therapy have to travel into Central London to receive treatment,” said Kelly Mallinson, architect at IBI Group. “This purpose-designed facility gives users and staff access to first-class facilities, improving the overall healthcare experience.”
The new building will offer chemotherapy and radiotherapy services supported by two specially designed linear accelerator rooms. Benefiting from ample parking, patients will also enjoy spacious, naturally lit accommodation with admission to a beautifully designed garden for contemplation and relaxation. Created by IBI Group’s landscape architects, this external space encompasses over 35 species of native plants, to encourage and support local wildlife species, whilst providing a holistic and complementary environment for patients during treatment.
The Cancer Centre is being developed and equipped by the American firm Healthcare Technologies International (HTI) and will be maintained by Oxleas NHS Foundation Trust which owns and manages the Queen Mary Hospital site. Built by Arien Contractors, the scheme is due to complete in 2016.
Featured News
Commercial kitchen and washroom surface manufacturer Rearo has launched a...
An exhaustive four-month project to replace existing fire compartmentation walls...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
2026 Product Brochur...
By The Radiator Compan...
System for Laying Fl...
By FassaFloor
Training for Excelle...
By Aico
The Connected Home S...
By Aico
Safety First, Aico F...
By Aico
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Partition wall systems made of glass allow transparent room partition. They open, divide and...
Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...
Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...