GOLDBECK completes landmark “Hive” facility at logistics hub

Latest News Thu, Oct 29, 2026 7:02 AM

GOLDBECK has completed “The Hive”, a new amenity building at DP World London Gateway logistics hub in Stanford-le-Hope, Essex.

The company delivered the scheme as a central meeting point for the businesses on site and the surrounding community.

Stanford-le-Hope, 28. 10 2026. Known as “The Hive,” the development was constructed on Ocean Boulevard at DP World London Gateway, Stanford-le-Hope, designed to serve both occupiers within the port and logistics park, as well as the wider community.

“The Hive supports the day-to-day needs of businesses operating within the DP World London Gateway site while also creating a space that extends beyond working hours. The building will serve a wider purpose to the community making it a shared space for business and residential use,” said Dan Bennett, Head of Project Management Logistics at GOLDBECK in the UK.

Image: SHEDSHOOTERS

The facility provides a mix of office accommodation, shared workspaces and food and beverage areas, alongside breakout zones designed to encourage interaction and collaboration. At its core, a full-height atrium spans all levels, creating a strong visual connection throughout the building and drawing natural light deep into the internal spaces. With a total floor area of just over 1,500 square metres across three levels, The Hive represents a compact, but highly impactful development.

In addition to the workplace, the scheme introduced a range of wellbeing and leisure facilities, including a gym, a multi-use games area (MUGA) and a padel court, with provision for a creche at a later stage. Several of these amenities have been made available to the local community outside standard operating hours, reinforcing the building’s role as more than just a workplace facility.

The building was designed to create a strong architectural presence. The Hive features a full-height structural glazed façade, complemented by copper-clad reveals. These elements are enhanced by recessed architectural lighting, giving the building a distinctive appearance after dark.

The wider façade continues the copper cladding theme, combined with curtain walling to create a consistent and contemporary aesthetic. The design was developed by Stephen George & Partners LLP, acting as CDM principal designer.

Access and movement around the site were carefully integrated into the overall scheme. Visitors approaching The Hive now cross a purpose-built pedestrian footbridge and cycleway, designed to provide a safe and welcoming route into the building. The bridge incorporates a timber-capped mesh balustrade, integrated lighting and resin-bound gravel finishes, creating a clear transition from the surrounding infrastructure into the amenity space.

Cycle storage, sheltered seating and clearly defined external routes further support accessibility and encourage sustainable travel options.

Internally, the building delivers a flexible and contemporary environment. A combination of glazed partitions, folding elements and dry-lined walls allows for a range of uses, accommodating both private office spaces and shared environments. Exposed structural steelwork and building services contribute to a modern industrial aesthetic

The central atrium forms the focal point of the building, extending through all floors to the underside of the roof, with suspended feature lighting enhancing the overall spatial experience.

External amenities and landscaping

The Hive extends beyond the building envelope, with a strong emphasis on external amenity provision. The completed development includes a multi-use games area, a padel court, outdoor seating zones, cycle storage and generous yard space, alongside a car park equipped with electric vehicle charging points. These features support both operational needs and future flexibility.

The surrounding landscape has been carefully designed, incorporating wild grass planting, hedgerows and new trees to soften the site and improve environmental integration.

Alan Holland, Chief Executive Officer at DP World London Gateway Logistics Park, commented on the project: “As the London Gateway Logistics Hub continues to grow, we want to ensure the infrastructure around it grows too. With The Hive now complete, we are creating a space where businesses can collaborate, employees can thrive and the local community can develop the skills needed to access new opportunities.

“London Gateway now supports more than 10,000 jobs through on-site employment and its role in the wider economy, and is already home to a growing community of some of the world’s leading businesses. The Hive gives that community a new place to come together. Alongside Thames Freeport, we are investing not only in the physical infrastructure of the site, but in the skills and amenities that will support its growth for many years to come.”

Acting as principal contractor, GOLDBECK delivered the full scheme, including external infrastructure. The Hive now stands as a central hub within the site, bringing together work, wellbeing and community in a single, connected environment.

Featured News

Specification news
PHT and CIBSE collaborate on new guidance for active...

The Passivhaus Trust (PHT) and CIBSE are working together to develop new technical...

Read More >>

Specification news
Celebrating excellence across passive fire protection -...

The Association for Specialist Fire Protection (ASFP) announced the winners of the...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Valley Through Range Brochure

Valley Through Range
By Filon Products Limit...

Download Now >>

Safer Replacement Starts Below. Filon Fixsafe. Brochure

Safer Replacement St...
By Filon Products Limit...

Download Now >>

A Smart Way to Refurbish Profiled Roofs. Over-Roofing. Brochure

A Smart Way to Refur...
By Filon Products Limit...

Download Now >>

Site Assembled Rooflights & Specialist GRP Sheets Brochure

Site Assembled Roofl...
By Filon Products Limit...

Download Now >>

Factory-Assembled Multi-Layer GRP Rooflights Brochure

Factory-Assembled Mu...
By Filon Products Limit...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Magply multi-functional board
Magply multi-functional board

Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...

Read More >>

Magply recovery and protection boards
Magply recovery and protection boards

Magply recovery and protection boards have been developed to meet the roofing industry needs for a...

Read More >>

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Introducing the all-new weberpral E
Introducing the all-new weberpral E

A high-performance monocouche render with 22% lower carbon emissions from fossil fuels* - helping...

Watch Now >>

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>