Designs for second phase of Ellison Institute of Technology campus revealed

Latest News Thu, Oct 16, 2025 5:49 AM

Foster + Partners is designing the second phase of the Ellison Institute of Technology (EIT) campus, which will extend the interdisciplinary research and development facility in Oxford.

The second phase encompasses the western part of The Oxford Science Park and features a state-of-the-art auditorium and autonomous and purpose-built laboratories, including those for generative biology, plant sciences, robotics, and AI, as well as other dynamic spaces for research and education.

Gerard Evenden, Head of Studio, Foster + Partners, said: “We are delighted to be designing the extended Ellison Institute of Technology campus, which will strengthen the Institute’s presence in Oxford and facilitate its groundbreaking research. Our design for the second phase builds upon and consolidates our work for phase one. Greenery knits together both parts of the site – directly connecting people with nature to foster wellbeing and enhance outcomes.”

Image: Foster + Partners

Lisa Flashner, Chief Operating Officer, EIT, said: “In addition to delivering a substantial contribution to the local economy, we aim for this expanded campus to set a new benchmark in innovation and design. In close collaboration with Foster + Partners, we have carefully refined every element to create a state-of-the-art campus that promotes collaboration across research disciplines and provides our employees with exceptional spaces that enhance their daily experience.”

At its conception in 2023, the campus was originally envisioned as a science complex of laboratories and office space covering 300,000 square feet. The Institute is now looking to develop laboratory and office spaces covering an area of two million square feet. Complete with leisure and catering facilities, the campus will become a welcoming workspace for a community of up to 7,000 employees.

Landscaping knits together the existing and newly acquired sites – creating a unified and green campus masterplan. A domed auditorium anchors the whole development and provides a central venue for large-scale events, surrounded by lush greenery and water. Taking cues from the city’s historic colleges, new laboratory buildings overlook two green quads that connect researchers directly with nature. A cohesive material palette ties together the different buildings across the campus masterplan.

Almost 70 percent of the site will be covered with greenery – including shaded woodland trails and a network of micromobility routes. Landscaping is sensitively designed to mitigate flood risks and enhance biodiversity.

This second phase of the campus design will allow EIT to augment its work on four humane endeavours – health, medical science and generative biology; food security and sustainable agriculture; climate change and managing atmospheric CO2 and AI and robotics.

Featured News

Specification news
Grant Westfield to demonstrate practical and stylish...

Grant Westfield, the company behind leading wall panel brands Multipanel and...

Read More >>

Specification news
Performance You Can Build On: FassaTherm Frame Plus,...

Fassa Bortolo’s FassaTherm systems continue to set the benchmark for...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>