Construction starts on landmark laboratory building at University of Southampton Science Park

Latest News Fri, Aug 1, 2025 8:10 AM

Construction has started on the new landmark laboratory building ‘Infinity Labs’ at University of Southampton Science Park and was marked by a groundbreaking ceremony.

The event was attended by Rt Hon Caroline Nokes, MP for Romsey and Southampton North, who put the first spade in the ground to officiate the milestone.

Dr Robin Chave, CEO of Southampton Science Park, was joined by Scott Brownrigg representatives Ed Hayden, Life Sciences Director, and Amy Bourne, Associate Project Leader, who have been responsible for the design of the new gateway building.

The new multi-tenancy building will provide 3,400 sqm of much needed new laboratory space at the entrance to the Southampton Science Park, supporting the Park’s commitment to fuel innovation and elevate the presence of British science and technology on the world stage.

Curved in shape, the three-storey building will activate a sweeping bend at the main entrance to the site and feature a sloping green roof, helping to embed the structure within the landscape and enhance biodiversity onsite.

A fabric first approach supports the Park’s sustainability objectives for a low-energy, low-carbon building.

Of the milestone, CEO of Southampton Science Park, Dr Robin Chave, said: “We are incredibly excited to officially commence construction of this widely anticipated project. This new building, the largest to be built at Southampton Science Park to date, is going to provide much-needed facilities for life science and other laboratory-based companies from spin-out and start-up onwards.

“It will play a significant role in helping the life science cluster in the region to grow and prosper, building on the talent emerging from our Universities and shining a light on the investment potential across the South Central economy.”

The Rt Hon Caroline Nokes, MP for Romsey and Southampton North, said: “It’s always great to be here at Southampton Science Park, witnessing how it develops and grows year on year.

“The new Infinity Labs building is impressive and beautiful. It is such an iconic looking building, and a real testament to the Science Park’s determination to grow, to bring high quality jobs to this area, and of course, to make sure that there are facilities that our scientists will use and desperately need.”

With the main contractor, Amiri Construction now starting works on site, the new landmark gateway building is expected to complete in 2026.

Featured News

Specification news
Met submits all Grenfell files to the CPS for charging...

The Met has now submitted all files to the Crown Prosecution Service to allow them to...

Read More >>

Specification news
Kilburn Mews regeneration on track as construction work...

Kilburn Mews, a transformative regeneration of Kilburn’s railway arches, has...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Flooring Collection 2026 Brochure

Flooring Collection...
By Gerflor

Download Now >>

Housing Brochure Brochure

Housing Brochure
By Gerflor

Download Now >>

CSR Report 2025 Brochure

CSR Report 2025
By Gerflor

Download Now >>

Thomas Company Brochure Brochure

Thomas Company Broch...
By Thomas Panels and Pr...

Download Now >>

SCHOTT UK Ltd- Certificate of Approval Brochure

SCHOTT UK Ltd- Certi...
By SCHOTT UK Ltd.

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Purlins & Sections
Purlins & Sections

Purlins & Sections for every projectOur range of cold rolled purlins and structural sections...

Read More >>

Composite Systems
Composite Systems

Our composite systems combine an external sheet, insulation core and internal liner in a single...

Read More >>

TPP 1000-32 Reverse
TPP 1000-32 Reverse

TECHNICAL: LOADSPAN TABLES AND DIMENSIONSOur profiled sheet load/span tables provide guidance on the...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>