Mace appointed to spearhead eco-driven office transformation on the Thames

Latest News Thu, Jul 17, 2025 5:50 AM

Global delivery consultants and construction experts, Mace, have been appointed by Pegasi to lead the transformation of Fresh Wharf, a prominent 1980s building, into a high-performance, sustainability-led workplace overlooking the River Thames in London.

Located just minutes from Tower Bridge, the 11-storey building will be reimagined into 120,000 sq ft of premium workspace, featuring 25,150 sq ft of outdoor space, a new riverside café, improved public realm and a destination restaurant.

Designed by Buckley Gray Yeoman, the scheme reflects a growing market trend to reposition existing buildings for a net-zero future while enhancing occupier experience.

Fresh Wharf is targeting some of the highest environmental and performance benchmarks in the sector, including BREEAM Outstanding, WELL Platinum, NABERS 4.5 Stars and WiredScore Platinum with a projected whole-life embodied carbon footprint of 933 kgCO₂/m².

In addition, approximately 50% of the building’s raised access flooring panels will be retained and reused, potentially saving up to 100 tonnes of CO₂. For newly fitted areas, low-carbon panels made from 86% recycled content will be installed. Each flooring panel is backed by an Environmental Product

Declaration and a material passport, ensuring full traceability and enabling future reuse.

Early-phase works are already delivering results with 30 tonnes of glazing removed from the original building being recycled through Saint-Gobain’s closed-loop glass system, saving a further 21.3 tonnes of CO₂.

Stewart Ward, Managing Director Fit out & Retrofit, Mace Construct said: “This project is about more than refurbishment; it’s about redefining what’s possible with existing buildings. At Fresh Wharf we’re proving that a 1980s structure can be transformed into a workplace that meets today’s highest sustainability standards, while delivering on design, modern occupier demands and creating long-term value.”

Scheduled for completion in 2026, Fresh Wharf is set to become a benchmark for sustainable workplace transformation in the City of London.

Jo Upton, CEO of Pegasi Limited commented: “Our long-term decision-making means that all the relationships we enter into have to be built on absolute confidence in quality, deliverability and resilience for what the occupier - or more accurately customer - will experience, not just on day 1 after practical completion, but in year 10. The creativity and ambition of this project has truly been a team effort, and we are delighted to be working with Mace as part of that extraordinary team”.

Featured News

Specification news
Manufacturing output back above pre-pandemic levels

All English regions and the three devolved nations have seen manufacturing output...

Read More >>

Specification news
CIBSE launches new Weather Data set to support...

As overheating in UK buildings becomes an increasingly urgent concern, CIBSE is...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Colorcoat HPS200 Ultra super durable case studies Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Confidex® Guarantee datasheet Brochure

Confidex® Guarantee...
By Tata Steel

Download Now >>

Colorcoat Prisma® colour card Brochure

Colorcoat Prisma® co...
By Tata Steel

Download Now >>

Colorcoat HPS200 Ultra® colour card Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

ParallelRoof 100
ParallelRoof 100

ParallelRoof 100 is a non-insulated conservatory system that provides the perfect solution for any...

Read More >>

MasterLine 8 Heritage Window and Door System
MasterLine 8 Heritage Window and Door System

MasterLine 8 is a high-specification, next-generation window and door system that delivers...

Read More >>

ConceptSystem 77 Heritage Window and Door System
ConceptSystem 77 Heritage Window and Door System

The ConceptSystem 77 system incorporates a comprehensive range of inward- and outward-opening window...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>