Responsibility for all fire functions moves to MHCLG

Latest News Wed, Apr 2, 2025 6:11 AM

Greater clarity and accountability will be brought to fire and building safety thanks to the transfer of Ministerial responsibility for all fire functions from the Home Office to the Ministry of Housing, Communities and Local Government.

Bringing these responsibilities together will strengthen coordination, improve policy implementation, and reinforce the government’s commitment to making homes, buildings and communities safer.

The change delivers on a key recommendation from the Grenfell Tower Inquiry’s Phase 2 report, which advised that fire and building safety should be overseen by a single department.

The Minister for Building Safety and Local Growth who will be taking on responsibility for fire functions Alex Norris said: “Ensuring the safety of people in their homes and communities is a top priority for this government. By bringing all fire and building safety responsibilities under one department, we are reinforcing accountability, improving coordination, and taking decisive action to protect lives.

“I would like to thank Dame Diana Johnson for her work in this important area. I look forward to working with fire and rescue services and key stakeholders to implement the Grenfell Tower Inquiry’s recommendations and drive forward the reforms needed to keep people safe.

“This is a significant step in delivering meaningful change, making our buildings safer, and strengthening our country’s resilience for the future.”

Policing Minister Dame Diana Johnson said: “It has been an honour and privilege to serve as Minister for Fire.

“I would like to express my utmost gratitude to the brave firefighters in our fire and rescue services, who selflessly dedicate themselves to protecting the public from fire every day.

“I would also like to thank the government officials and stakeholders from across the sector I have worked with over the past nine months. Their drive to make the sector stronger has been invaluable and I am certain my good friend Alex Norris will also benefit from their advice.”

Following the publication of the Grenfell Tower Inquiry’s Phase 2 report on 4 September 2024, the Prime Minister acknowledged the failings that led to the tragedy and reaffirmed the government’s commitment to implementing the necessary reforms. This transfer of Ministerial responsibility for all fire functions to the Ministry of Housing, Communities and Local Government represents an important part of this work, and the government will continue to drive forward the necessary reforms to make sure a tragedy like Grenfell can never happen again.

Featured News

Specification news
Kier completes UK’s first all-electric prison

Kier has delivered the new HMP Millsike for the Ministry of Justice, increasing...

Read More >>

Specification news
Manufacturing production contracts at faster pace as...

The end of the opening quarter saw the downturn at UK manufacturers deepen. Rates...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

Hardie backer fibre cement backerboard for Tile & Stone  Brochure

Hardie backer fibre...
By James Hardie

Download Now >>

RIVERSTONE® - DISCOVER NATURAL PHYLLITE Brochure

RIVERSTONE® - DISCOV...
By SSQ

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Senses White Fleck Kitchen Surfaces
Senses White Fleck Kitchen Surfaces

Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...

Read More >>

SM 485: fast-setting, self-levelling smooth coat for interior floors
SM 485: fast-setting, self-levelling smooth coat for interior floors

FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...

Read More >>

SL 416: A fast-setting, self-levelling smooth coat for interior floors
SL 416: A fast-setting, self-levelling smooth coat for interior floors

FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>