Building Safety Levy pushed back to Autumn 2026

Latest News Tue, Mar 25, 2025 7:08 AM

The Ministry for Housing, Communities and Local Government has announced the implementation timeline for the Building Safety Levy has been pushed back from Autumn 2025 to Autumn 2026.

It has published the Government’s response to the building safety levy technical consultation which ran from 23 January 2024 to 20 February 2024.

The key design elements of the levy arising from the consultation response include:

– the process for calculation and collection of the levy, 

– the use of Gross Internal Area to measure floorspace for the purposes of calculating levy liability, 

– the approach to identifying brownfield land that will qualify for the discount rate, 

– the levy disputes process, and 

– confirming further types of accommodation that will be subject to exclusion. 

Ministers have now determined that the levy will now come into effect in Autumn 2026. This will give the relevant local authorities, the Building Safety Regulator and Registered Building Control Approvers more time to prepare for the levy; and housing developers who will pay the levy will also have more time to factor levy costs into their financial planning.

The Government has also announced the levy rates for local authorities, that will be applied when the levy comes into force. These levy rates will be set in regulations and are subject to parliamentary agreement of the levy secondary legislation, which will be laid later this year. Levy rates for each local authority area are set using average house prices for that area, so the levy rate is highest in those areas with the highest house prices, and lowest in those areas with the lowest house prices.

A discounted rate of 50% of the standard levy rate has been set for works on previously developed (sometimes known as ‘brownfield’) land, to reflect the higher cost of building on this type of land. The levy will be charged per square-metre of floorspace in a chargeable development. The rates are therefore set per square-metre.

Further information on the levy will be available later this year when regulations are laid in Parliament and related interim guidance is published.

Other levy design features remain as previously announced: the levy will be charged on new dwellings and purpose-built student accommodation in England, and must be paid before a completion certificate can be issued. Exemptions are provided for affordable housing, developments of fewer than 10 units and other important community facilities.

Local authorities with building control responsibilities will act as collection authorities for the levy.

Neil Jefferson, Chief Executive at the Home Builders Federation said; “The delay to the implementation of this new tax on home building is welcome recognition from government that these additional costs will inevitably constrain housing supply, but the news that ministers will still press ahead with this grossly unfair levy rather than obtaining contributions from powerful product manufacturers is a disappointment.

“As proposed it will add thousands of pounds to the cost of new homes, threatening the viability of sites across swathes of the country at a time when industry is striving to reverse the decline in home building numbers that we have seen in recent years.

“UK house builders are already paying over £6bn to remediate all their own buildings as well as those build by other parties through the pre-existing building safety tax. Surely the companies that tested and supplied the dangerous materials, still yet to contribute a penny, should be targeted before Government imposes yet another tax on British businesses, many of whom have never built anything taller than a typical family house."

Featured News

Specification news
Proctor Air is an air permeable low resistance (APLR)...

While the majority of APLRs in use today utilise an airtight, vapour permeable, film...

Read More >>

Specification news
BSR pilots recent operational changes

The Building Safety Regulator’s (BSR) Gateway 2 (GW2) update to 1 October 2025,...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Our product range at a glance... Brochure

Our product range at...
By Premier Loft Ladders...

Download Now >>

Your Specialist Partner in Composite Steel Roof & Floor Decking Brochure

Your Specialist Part...
By RMD Profiles Ltd

Download Now >>

PVC-U System Fully Reversible Windows by Epwin Window Systems Brochure

PVC-U System Fully R...
By Epwin window systems...

Download Now >>

Spectus Bevelled Windows and Doors Brochure

Spectus Bevelled Win...
By Epwin window systems...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Proctor Air
Proctor Air

Proctor Air® is an air permeable low resistance (APLR) underlay for pitched roof applications. ...

Read More >>

DUOFLEX
DUOFLEX

DUOFLEX is a high quality elastomeric bitumen, hot bonded to the substrate incorporating the fleece...

Read More >>

TECSOUND
TECSOUND

TECSOUND is a polymer based, bitumen-free, high-density synthetic membrane. The combination of its...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Proctor Air® Product Explainer
Proctor Air® Product Explainer

Proctor Air® is an air and vapour permeable, highly water resistant roofing underlay. Its...

Watch Now >>

Discover the Power of Blue Roofs in Urban Flood Management
Discover the Power of Blue Roofs in Urban Flood Management

In this video, we explore how blue roofs are transforming urban landscapes by helping to mitigate...

Watch Now >>

RMD Profiles - UK Experts in Metal Decking, Design Installation
RMD Profiles - UK Experts in Metal Decking, Design Installation

At RMD Profiles, we’re more than just metal decking. From supply-only solutions to full design and...

Watch Now >>