Green Energy Park development consent decision announced

Latest News Fri, Mar 14, 2025 7:42 AM

The North Lincolnshire Green Energy Park application has today been granted development consent by the Secretary of State for Energy Security and Net Zero.

The scheme consists of an Energy Recovery Facility (ERF) converting up to 650,000 tonnes per annum of Refuse Derived Fuel (RDF) to generate a maximum of 95 Mega Watts of electrical output (MWe) and/or 380 Mega Watts of thermal output (MWt) to provide power, heat and steam on the site of the operating Flixborough Wharf on the River Trent. 

The application was submitted to the Planning Inspectorate for consideration by North Lincolnshire Green Energy Park Limited on 31 May 2022 and accepted for Examination on 27 June 2022. 

Following an Examination during which the public, Statutory Consultees and Interested Parties were given the opportunity to give evidence to the Examining Authority, recommendations were made to the Secretary of State on 15 August 2023.  

This is the 90th energy application out of 150 applications examined to date and was again completed by the Planning Inspectorate within the statutory timescale laid down in the Planning Act 2008.  

Local communities continue to be given the opportunity of being involved in the examination of projects that may affect them. Local people, the local authority and other Interested Parties were able to participate in this six-month Examination.  

The Examining Authority listened and gave full consideration to all local views and the evidence gathered during the Examination before making its recommendation to the Secretary of State. 

Featured News

Specification news
Last chance to visit the RIBA Bookshop before 66...

The RIBA Bookshop, Europe’s leading specialist architectural bookshop supplying...

Read More >>

Specification news
New Sales Manager for Vox Ignis

Global voice alarm and emergency audio and alarm systems business Vox Ignis has...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

AKW Bathroom Catalogue 2025 Brochure

AKW Bathroom Catalog...
By AKW

Download Now >>

Baths Collection Brochure Brochure

Baths Collection Bro...
By AKW

Download Now >>

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>