Latest News Fri, Mar 14, 2025 7:42 AM
The North Lincolnshire Green Energy Park application has today been granted development consent by the Secretary of State for Energy Security and Net Zero.
The scheme consists of an Energy Recovery Facility (ERF) converting up to 650,000 tonnes per annum of Refuse Derived Fuel (RDF) to generate a maximum of 95 Mega Watts of electrical output (MWe) and/or 380 Mega Watts of thermal output (MWt) to provide power, heat and steam on the site of the operating Flixborough Wharf on the River Trent.
The application was submitted to the Planning Inspectorate for consideration by North Lincolnshire Green Energy Park Limited on 31 May 2022 and accepted for Examination on 27 June 2022.
Following an Examination during which the public, Statutory Consultees and Interested Parties were given the opportunity to give evidence to the Examining Authority, recommendations were made to the Secretary of State on 15 August 2023.
This is the 90th energy application out of 150 applications examined to date and was again completed by the Planning Inspectorate within the statutory timescale laid down in the Planning Act 2008.
Local communities continue to be given the opportunity of being involved in the examination of projects that may affect them. Local people, the local authority and other Interested Parties were able to participate in this six-month Examination.
The Examining Authority listened and gave full consideration to all local views and the evidence gathered during the Examination before making its recommendation to the Secretary of State.
Featured News
The downturn in the UK manufacturing sector showed further signs of slowing at the...
The Minister for Industry has launched the Construction Leadership Council’s Health...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
HPS200 Ultra Case St...
By Tata Steel
Confidex Datasheet
By Tata Steel
Prisma UK 2024
By Tata Steel
HPS200 Ultra UK
By Tata Steel
Amtico Bio Support D...
By Amtico
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...
Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...
Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...
https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....
A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...