King’s Road Park scheme receives green light

Latest News Tue, Jan 28, 2025 9:27 AM

St William, a Berkeley Group company, has been granted detailed planning permission for phase four of the King’s Road Park masterplan, including 357 homes and 1.9 acres of new parkland and public open space.

Foster + Partners’ approved design includes a pair of slender residential towers (28 and 38 storeys), and a podium building (seven-storeys).

The development includes a range of communal spaces for the residents – including a ground level amenity space within the podium that integrates seamlessly with the surrounding landscape.

Giles Robinson, Senior Partner, Foster + Partners, said: “We are delighted that our design for the King’s Road Park development has been given the green light. The scheme will provide the highest quality homes that overlook one of London’s most spectacular new public parks. Responding to St William’s brief and working closely with the landscape designers, Gillespies, our design complements the historic urban surroundings and enhances connections with nature, by significantly increasing the amount of green space at the base of the towers and extending the experience of the park onto the podium’s rooftop.”

Dean Summers, Managing Director, St William, said: “The vision for King’s Road Park is to transform a redundant gasworks into a sustainable and welcoming neighbourhood, including a beautiful park and around 1,800 private and affordable homes. This is brownfield regeneration at its best and we’re delighted to have been granted planning consent for this important part of the masterplan. I want to thank Foster + Partners, Gillespies, the London Borough of Hammersmith & Fulham and local stakeholders for evolving the exceptional designs for phase four. This will be a very special part of King’s Road Park and a place the whole community can enjoy for generations to come.”

The two residential towers and podium are located on the eastern side of the masterplan. New homes face onto the park, which is located at the centre of the wider development and features a restored Grade II* listed gasholder. Apartments are dual aspect – for ample daylight inside every home – with corner balconies that offer unparalleled views across London and the park. An additional residential garden, on the roof of the podium, is covered by a louvred canopy to provide protection from the elements throughout the year.

By removing one of the towers (previously three for the outline scheme) and increasing the size of their floorplates, the practice’s design reduces the development’s embodied carbon, meets future fire safety requirements, improves views of the development, and significantly increases the amount of daylight entering the park by 59 percent. The distance between the two towers is also maximised to expand the park’s area and enhance connectivity between King’s Road and Imperial Wharf station by the river.

The towers have a slender vertical language that complements the urban skyline. Their slenderness is emphasised by extending the façade elements from the ground to the highest levels of the buildings. Terracotta panels clad the middle section of the buildings’ façades, providing additional depth and responding to the local vernacular within the design district.


The new open landscape, designed by Gillespies, evolved in collaborative design with Foster + Partners and includes a new community park, public square, children’s play areas, walking routes and welcoming natural habitats for both people and wildlife to enjoy. This will form a key part of the ambitious six-acre network of open landscape being created at King’s Road Park, which is expected to create a biodiversity net gain of approximately 112 percent.

The design and placemaking strategy for phase four were developed through engagement with Hammersmith & Fulham Council’s planning team and local stakeholders. This included a pre-submission design review panel and a series of detailed pre-application meetings with LBHF officers.

Foster + Partners’ phase four design reworks a previously submitted outline scheme, removing one tower and increasing the size of the floorplates in the two remaining buildings. The design has increased the size of the public park by almost 5,000 square feet and improves connectivity between King’s Road and Imperial Wharf Station.

Featured News

Specification news
New from Garador

GaraPro Automation Kit + Door Package for just £949Garador has just launched its...

Read More >>

Specification news
Renson at the Old War Office: Historic elegance, modern...

The historic Old War Office (OWO), a Grade II* listed neo-Baroque landmark in central...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Vertical radiators complete range Brochure

Vertical radiators c...
By Myson

Download Now >>

Myson Radiant Heating Premium underfloor heating systems Brochure

Myson Radiant Heatin...
By Myson

Download Now >>

Which heat emitter is the right one? Brochure

Which heat emitter i...
By Myson

Download Now >>

Sustainable heating solutions for renovation Brochure

Sustainable heating...
By Myson

Download Now >>

Rearo Tradeline Brochure

Rearo Tradeline
By Rearo

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

DUOFLEX
DUOFLEX

DUOFLEX is a high quality elastomeric bitumen, hot bonded to the substrate incorporating the fleece...

Read More >>

TECSOUND
TECSOUND

TECSOUND is a polymer based, bitumen-free, high-density synthetic membrane. The combination of its...

Read More >>

ISOLAIR MULTI
ISOLAIR MULTI

ISOLAIR MULTI is a natural and ecological vapour-permeable, windproof and water-repellent thermal...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Our SUSTAINABILITY Roadmap
Our SUSTAINABILITY Roadmap

Myson has a clear sustainability strategy in line with the UN Sustainable Development Goals (SDGs)...

Watch Now >>

Sustainable Energy Efficient Solutions
Sustainable Energy Efficient Solutions

From radiators and underfloor heating to ceiling convectors and towel warmers, Myson is the UK’s...

Watch Now >>

UNISENZA PLUS Smart Controls_The complete system solution
UNISENZA PLUS Smart Controls_The complete system solution

With Unisenza Plus Smart Controls you can easily monitor and control all linked heating products via...

Watch Now >>