Raptor cranes helping raise the bar when it comes to productivity

Latest News Thu, Jan 16, 2025 6:59 AM

On the top of the two huge slipform cores, some 120m high and rising above our 2 Finsbury Avenue site in London, another great example of engineering excellence is making a big contribution to productivity on this landmark City project.

Built onto each of the two slipform platforms is a Raptor crane, a type of plant designed for lifting in tight spaces, especially in confined inner-city sites and where air space restrictions are a major issue.

At 2 Finsbury Avenue, the cranes are deployed to feed the slipform process being used to construct the cores for the development’s dual high-rise towers of 23 and 37 storeys respectively.

On each core, 103 hydraulic jacks are being used to incrementally lift the 120 tonne rigs and the 60 tonne raptor cranes as the respective slipforms rise some 1.2m per day.

The inclusion of the raptor cranes avoids the need for a tower crane to be tied and climbed to feed the slipform construction, whilst freeing up the main tower cranes to construct the structural steelwork. Avoiding tying and climbing minimises weather delays and the significant disruption to lifting every time a new tie and mast section is added.

Whilst not unique, the use of Raptor cranes in this way is a somewhat unconventional approach.

2 Finsbury Avenue is British Land’s largest project to date and the final piece of the jigsaw in the current regeneration of Broadgate into a world class, seven-day, mixed-use central London destination.

It comprises dual high-rise towers, the 36-storey East Tower and the West Tower at 21-storeys. The towers will be instantly recognisable landmarks, characterised by innovative triangular patterns combining a solid and glazed sawtooth-shaped facade that supports double height spaces.

Featured News

Specification news
CIEH echoes calls for ‘urgent, coordinated action’...

The Chartered Institute of Environmental Health (CIEH) has joined with fellow members...

Read More >>

Specification news
Nominations are now open for the 2026 Pump Industry...

The British Pump Manufacturers Association is excited to announce that the nomination...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>