City centre market hall building officially handed over

Latest News Fri, Aug 23, 2024 6:16 AM

Construction of a new multi-million pound indoor market hall building that has been designed to revitalise Bradford city centre has been completed by Kier.

The new Darley Street Market building has been officially handed over to Bradford Council after contractor Kier completed the build, allowing next stage of the work to fit-out the building to commence.

Set in a 4000m2 prime city centre location, Darley Street Market will feature three bustling trading floors and a terrace balcony overlooking the 1,000 m2 open air market square that will welcome independent traders as well as creating a cultural space for live music, arts and entertainment.

Below the market square is a large underground area for trader deliveries, additional storage and waste handling and recycling.

The state-of-the-art venue has energy efficiency at its core, with escalators and lifts powered by 190 rooftop solar panels, with air source heat pumps and photovoltaic panels heating the water supply.

Toilets are flushed using an automatic rainwater harvesting system providing a consistent supply of water that will also feed the watering system for the outdoor planting areas. This is supported by real-time weather data to ensure optimal storage levels are maintained whilst minimising wastewater discharge. Two flood-prevention holding tanks can also capture up to 9,000 litres of rainwater, which will help to control the flow of water into the main sewer. The market’s ten roof lights and wall mounted grilles provide the interior with natural light and ventilation whilst also regulating internal temperatures and reducing the need for artificial heating or cooling.

Other integrated features include a digital energy management system that will monitor, analyse and control the market’s internal environment, as well as a smart heating system to reduce energy consumption and an extensive network of smart meters to track energy use.

As part of the project, the Kier team has delivered a significant social value programme of activity which has resulted in over £10m of the project value being procured through local businesses and suppliers.

Councillor Alex Ross-Shaw,Bradford Council’s Executive Member for Regeneration, Planning and Transport, said: "I’d like to thank partners Kier for their work on the construction of this new state-of-the-art market building, which will be enjoyed by people from across the district and beyond. We’re looking forward to progressing through the next stage of the project, which is working with traders on the fit out of their stalls."

Dan Doherty, regional director of Kier Construction North & Scotland, said: "This is a stand-out development for Bradford city centre and brings urban sustainability and community development together in one building.

“I am incredibly proud of the work our teams have done to finish this fantastic building, as well as the positive legacy we’ll leave behind as a result of our work within the local community. I look forward to seeing the market and local area flourish once it is completed. Thank you to everyone involved."

Featured News

Specification news
Shortlist announced for the Top 100 Most Influential...

The Construction Industry Training Board (CITB) has announced the shortlist for the...

Read More >>

Specification news
Willmott Dixon chosen for Barnes Hospital regeneration

Willmott Dixon has started a £30m programme of regeneration at Barnes Hospital. ...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>