Grenfell Tower memorial design team selection process launched

Latest News Wed, Jul 10, 2024 8:06 AM

The Grenfell Tower Memorial Commission and the Royal Institute of British Architects (RIBA) have launched the process to select the team that will design the future memorial on the site of Grenfell Tower.

This is a hugely significant step in the Memorial Commission’s journey to create a bold, fitting, and lasting memorial to remember the 72 victims who lost their lives in, and those whose lives were forever changed by, the devastating Grenfell Tower fire.

The Commission’s publication of their design brief provides the criteria that interested teams must meet, and details about how they can apply. Teams are being asked to demonstrate their relevant, professional and specialist expertise including architecture, landscape architecture, and structural and mechanical engineering. Teams must also have strong experience of working collaboratively with communities.

Image: Zute Lightfoot, ACAVA Shoots

A shortlist of up to five teams will be notified in the autumn. These teams will be asked by the Commission to prepare the design approach they would take if appointed. With direct input from the Grenfell community, the final team is expected to be selected and announced in spring 2025. It is anticipated that the memorial design should be sufficiently developed, in partnership with the community, to allow for a planning application in 2027.

In November 2023, the Grenfell Tower Memorial Commission published its second report, detailing the Grenfell community's wishes for a permanent memorial. The report called on the government to honour its earlier commitments and fulfil its moral duty to deliver all sixteen of the Commission’s recommendations.

Among the recommendations, are: 

  • The Grenfell community must always be central to decisions about the memorial. 
  • The memorial must be a peaceful, sacred space for individual and communal remembrance and reflection. 
  • The design must reflect the diverse faiths and cultural backgrounds of the Grenfell community. 
  • The memorial should include a garden, a monument or other structure, and options for commemorating the names of those lost, featuring art, water, and light. 

The Grenfell Tower Memorial Commission’s ten community representatives, said: “Launching the memorial design team selection process brings us a significant step closer to turning the Grenfell community’s memorial vision into a physical reality.

“Through this process, we intend to identify and appoint a specialist and worthy design team. A team that has proven experience of working on sensitive and community-focused projects, and who can clearly demonstrate the integrity with which they will approach this vital task.

“The beautiful and lasting memorial to our 72 loved ones deserves nothing less.” 

Thelma Stober and Lord Paul Boateng, co-chairs of the Grenfell Tower Memorial Commission said: “Our primary commitment as the Commission is to establish a dignified and peaceful space for the Grenfell community to commemorate. 

“And our fundamental pledge, from the outset, has been to prioritise the voices and wishes of the entire Grenfell community in the decision-making process, both now and in the future. 

“The bereaved, survivors, and the broader Grenfell community will play integral roles at every stage. This will ensure that the final design embodies a truly meaningful tribute to the 72 lives lost and provides a lasting and appropriate place for loved ones to pay their respects, mourn, and feel connected to their memory.” 

Jane Duncan OBE PPRIBA, RIBA Competitions Architect Adviser, Past-President of RIBA and Chair of RIBA’s Fire Safety Expert Advisory Group since 2017, said: “Any process to design a memorial is a huge challenge, but the Grenfell Tower tragedy struck a blow so deeply sad, so shocking and so intense into hearts all around the globe, that to find the right design team, able to draw upon their deepest streams of empathy and delicacy, is a tricky task.

“This incredible and unique design team selection process sits naturally on an international stage, just as the tragedy resonated far across the globe.

“I ask all architects and designers, wherever you may be, to consider if you have the right skills and experience in dealing with many and diverse stakeholders, in sensitivity of approach and compassion, as well as the innovation and creativity to interpret and deliver a wonderful design to meet a very personal and touching brief.

“This selection process is a wonderful opportunity to present your most well-rounded team, and express your capabilities, your openness, your imagination, and actually, also, your humanity. We look forward to hearing from you.”

Submissions for Phase 1 must be received by Wednesday 18 September 2024. You can find out more information at: www.grenfelltowermemorial.co.uk/design

Featured News

Specification news
Private housebuilders ramp up plans ahead of planning...

Private housebuilders applied to build more new homes last year ahead of changes to...

Read More >>

Specification news
BRE launches AI-powered upgrade to industry-leading...

The Building Research Establishment (BRE) – the leading building science centre –...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

Hardie backer fibre cement backerboard for Tile & Stone  Brochure

Hardie backer fibre...
By James Hardie

Download Now >>

RIVERSTONE® - DISCOVER NATURAL PHYLLITE Brochure

RIVERSTONE® - DISCOV...
By SSQ

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Senses White Fleck Kitchen Surfaces
Senses White Fleck Kitchen Surfaces

Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...

Read More >>

SM 485: fast-setting, self-levelling smooth coat for interior floors
SM 485: fast-setting, self-levelling smooth coat for interior floors

FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...

Read More >>

SL 416: A fast-setting, self-levelling smooth coat for interior floors
SL 416: A fast-setting, self-levelling smooth coat for interior floors

FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>