The renaissance of Hilsea Lido is set to begin

Latest News Thu, May 30, 2024 5:55 AM

Work to transform a much-loved outdoor pool begins at the end of May, as contractors begin the restoration of Hilsea Lido.

The council are redeveloping Hilsea Lido as part of the Hilsea Lines project in the north of the city, to improve the area and encourage residents and visitors to use it.

The council have been working closely with consultancy company, Mace, along with contractors, Beard, to plan this complex project, with lots of work needed to bring the lido back into public use. Now that this stage has been completed, work will begin on-site from the week commencing the 27 May. This follows consultation events that took place with the community in March this year.

The first thing the public will have seen is the removal of some of the fountain parts at the west end of the site. Pipework under the fountain needs to be removed as part of the project, so a replica is being created by Portsmouth based stonemason Darren Somerville. It’ll be restored in pride of place in the middle of the site when the project is complete.

The spectator stand at the north of the site has been declared unsafe, so this will be removed. This will include the mural by My Dog Sighs. The council are working with him to record the demolition as part of the project, and he will return to paint another mural once the lido is up and running again.

Other work includes removing the plant room roof to clear away the old pool equipment, which will be replaced with a brand new, modern filtration system. The pool will also be drained, ready for work to take place to stabilise the base and restore the original lagoons that had been removed.

Once the initial phase of the work is complete, the project will move into the build stage where new pipework will be installed in deep trenches, the pool and the surrounding area will be restored, and new modular changing units will be installed. The project is due to be complete by spring 2025, and open to the public for the summer season.

Lesha Chetty, Business Unit Director for Local Government and Communities at Mace Consult, said: “We know how valuable facilities like Hilsea Lido are in creating a sense of place for residents and boosting Portsmouth’s economy. That’s why we’re delighted to be supporting the council on its transformation, leaving a legacy for local communities and restoring a valuable asset for the city.”

Pat Hughes, Director at Beard, said: “Beard is hugely honoured to be chosen to complete this wonderful restoration project. It is a fantastic way to mark the opening of our new office in the region and will allow us to showcase more than a century of skills and experience in delivering exceptional builds. This includes work within the education sector, healthcare, historic buildings and in sports and leisure, including outdoor public swimming facilities.

“We look forward to working with Portsmouth City Council and all parties to deliver the exciting vision for this iconic attraction.”

Featured News

Specification news
NEW GLOBAL NEC CONTRACTS RESEARCH PUTS BUILT...

New report draws on views of more than 1,000 construction professionals across...

Read More >>

Specification news
Interactive Clerkenwell installation invites architects...

wienerberger’s live installation, “The People Behind Safer Buildings”, will be...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>