Schools and colleges to receive funding to permanently remove RAAC

Latest News Fri, Feb 9, 2024 7:57 AM

Measures to permanently remove Reinforced Autoclaved Aerated Concrete (RAAC) from all affected schools and colleges, have been confirmed by the Government.

A final list of schools and colleges with confirmed cases of RAAC in schools and colleges in England has been published today. There are 234 education settings, out of 22,000, with confirmed RAAC in some areas of their buildings - around 1%.

It says 119 of these schools will have one or more buildings rebuilt or refurbished through the School Rebuilding Programme where works to remove RAAC are more extensive or complex.

Additionally 110 schools and colleges will benefit from grant funding to remove RAAC from their buildings where works will typically be smaller in scale.

Five schools and colleges, with support from the Department, have alternative arrangements in place to address the removal of RAAC, for example the building will not be part of the school or college estate over the longer term.

Those responsible for affected school and college buildings are today receiving direct confirmation from the department on how the RAAC removal will be funded.

Education Secretary, Gillian Keegan, said: “Nothing is more important to me than the safety of every child and member of staff in school.

“We will continue to work closely with schools and colleges as we take the next step to permanently remove RAAC from affected buildings.

“I want to thank all schools, colleges and local authorities who have worked tirelessly with the department to ensure all children remain in face-to-face education.”

The Department’s RAAC Identification programme is now complete as 100% of schools and colleges with blocks built in the target era have responded to the questionnaire.

All schools or colleges that advised us they suspect they might have RAAC have had a survey to confirm if RAAC is present.

A small number of schools and colleges are carrying out additional checks for further assurance in some spaces. The Department is working with responsible bodies to support them to complete these additional checks as quickly as possible.

In addition to the 119 schools with confirmed RAAC included in the School Rebuilding Programme, the Department has today confirmed that a further 8 schools without RAAC have also been added to the programme. The projects announced today take the total number of schools in the programme to 513. The ten-year School Rebuilding Programme is continuing to prioritise school buildings with the highest condition need across England through rebuilding or significantly refurbishing buildings.

The Government has already confirmed it will fund schools and colleges for the costs of work needed to mitigate the presence of RAAC. Today’s announcement provides certainty for individual schools or colleges in England on how the Government will support the removal of RAAC from their buildings.

Our priority will always be to ensure the safety of pupils and staff, which is why we took a cautious approach for schools and colleges. Although the technical advice does not recommend removal in all cases where it is present, we have taken a precautionary approach for the education estate in England to remove RAAC.

Already £1.8 billion has been committed in capital funding this year to support schools to stay in good working order, as part of £15 billion allocated since 2015. The School Rebuilding Programme will transform over 500 schools over the next decade. A further £1.5 billion has been made available for colleges through the further education capital transformation fund.

Featured News

Specification news
RENOLIT ALKORPLAN roofing products expands European...

The new UK training centre marks a strategic expansion of RENOLIT ALKORPLAN roofing...

Read More >>

Specification news
Chancellor appoints infrastructure and planning adviser...

Leading planning lawyer Catherine Howard has been appointed to advise Chancellor...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

ACO Blue Roof Guide – Vol 2 Brochure

ACO Blue Roof Guide...
By ACO Building Drainag...

Download Now >>

Stannah Commercial Brochure Brochure

Stannah Commercial B...
By Stannah Group

Download Now >>

Stannah Midilift CLS Brochure

Stannah Midilift CLS
By Stannah Group

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Supreme Heavy-Duty Loft Ladder
Supreme Heavy-Duty Loft Ladder

The Supreme heavy-duty loft ladder is supplied as a ready to fit unit. It is manufactured from high...

Read More >>

Designo Loft Ladder
Designo Loft Ladder

Insulated and Airtight wooden loft ladder……sets the standard for long-lasting quality and...

Read More >>

Elite Loft Ladder
Elite Loft Ladder

The Elite heavy-duty loft ladder...The Elite heavy duty concertina loft ladder is supplied without a...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Proctor Air® Product Explainer
Proctor Air® Product Explainer

Proctor Air® is an air and vapour permeable, highly water resistant roofing underlay. Its...

Watch Now >>

Discover the Power of Blue Roofs in Urban Flood Management
Discover the Power of Blue Roofs in Urban Flood Management

In this video, we explore how blue roofs are transforming urban landscapes by helping to mitigate...

Watch Now >>

RMD Profiles - UK Experts in Metal Decking, Design Installation
RMD Profiles - UK Experts in Metal Decking, Design Installation

At RMD Profiles, we’re more than just metal decking. From supply-only solutions to full design and...

Watch Now >>