Schools and colleges to receive funding to permanently remove RAAC

Latest News Fri, Feb 9, 2024 7:57 AM

Measures to permanently remove Reinforced Autoclaved Aerated Concrete (RAAC) from all affected schools and colleges, have been confirmed by the Government.

A final list of schools and colleges with confirmed cases of RAAC in schools and colleges in England has been published today. There are 234 education settings, out of 22,000, with confirmed RAAC in some areas of their buildings - around 1%.

It says 119 of these schools will have one or more buildings rebuilt or refurbished through the School Rebuilding Programme where works to remove RAAC are more extensive or complex.

Additionally 110 schools and colleges will benefit from grant funding to remove RAAC from their buildings where works will typically be smaller in scale.

Five schools and colleges, with support from the Department, have alternative arrangements in place to address the removal of RAAC, for example the building will not be part of the school or college estate over the longer term.

Those responsible for affected school and college buildings are today receiving direct confirmation from the department on how the RAAC removal will be funded.

Education Secretary, Gillian Keegan, said: “Nothing is more important to me than the safety of every child and member of staff in school.

“We will continue to work closely with schools and colleges as we take the next step to permanently remove RAAC from affected buildings.

“I want to thank all schools, colleges and local authorities who have worked tirelessly with the department to ensure all children remain in face-to-face education.”

The Department’s RAAC Identification programme is now complete as 100% of schools and colleges with blocks built in the target era have responded to the questionnaire.

All schools or colleges that advised us they suspect they might have RAAC have had a survey to confirm if RAAC is present.

A small number of schools and colleges are carrying out additional checks for further assurance in some spaces. The Department is working with responsible bodies to support them to complete these additional checks as quickly as possible.

In addition to the 119 schools with confirmed RAAC included in the School Rebuilding Programme, the Department has today confirmed that a further 8 schools without RAAC have also been added to the programme. The projects announced today take the total number of schools in the programme to 513. The ten-year School Rebuilding Programme is continuing to prioritise school buildings with the highest condition need across England through rebuilding or significantly refurbishing buildings.

The Government has already confirmed it will fund schools and colleges for the costs of work needed to mitigate the presence of RAAC. Today’s announcement provides certainty for individual schools or colleges in England on how the Government will support the removal of RAAC from their buildings.

Our priority will always be to ensure the safety of pupils and staff, which is why we took a cautious approach for schools and colleges. Although the technical advice does not recommend removal in all cases where it is present, we have taken a precautionary approach for the education estate in England to remove RAAC.

Already £1.8 billion has been committed in capital funding this year to support schools to stay in good working order, as part of £15 billion allocated since 2015. The School Rebuilding Programme will transform over 500 schools over the next decade. A further £1.5 billion has been made available for colleges through the further education capital transformation fund.

Featured News

Specification news
Securing the Future: Abloy UK launches new white paper

Abloy UK, a leading provider of security and access control solutions, has launched a...

Read More >>

Specification news
Making the difference with MHI Projects

Dedicated support from the MHI Projects team has helped provide a major climate...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Matfen Hall Case Study Brochure

Matfen Hall Case Stu...
By Passivent

Download Now >>

FRAMESAFE FR A2 FIRE RATED EXTERNAL WALL BREATHER MEMBRANE  Brochure

FRAMESAFE FR A2 FIRE...
By Glidevale Protect

Download Now >>

A Guide to Aluminium Fencing Brochure

A Guide to Aluminium...
By F.H. Brundle

Download Now >>

Handrailing & Balustrade Systems Brochure

Handrailing & Balust...
By F.H. Brundle

Download Now >>

RLG600 Access Flooring System Brochure

RLG600 Access Floori...
By Kingspan Data & Floo...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>

Straightcurve® Product Range Overview - A Demonstration of Installation Ease
Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Straightcurve® Product Range Overview - A Demonstration of Installation Ease

Watch Now >>