Net-zero in operation college completes successful handover

Latest News Tue, Jan 9, 2024 7:56 AM

Phase two of Building North East and Yorkshire’s Net Zero Carbon in Operation (NZCiO) project, Greenhead College, has been successfully handed over, with students now using the new facilities.

The Greenhead College sixth form building, is part of the first wave of the Department for Education’s School Rebuilding Programme, which is funding the rebuilding or refurbishment of 500 schools and colleges across the UK.

The design for Greenhead College removes the use of fossil fuels and adopts a fabric-first approach to improve the envelope of the college, reducing the energy demand through passive design methods, and helping achieve an NZCiO specification.

The four-storey, 57,000 sqft building features state-of-the-art laboratories and classrooms, as well as a main hall and dining space. Following the handover of phase two, work will soon begin on phases three and four, which will involve the demolition of an existing building and the construction of a new two-storey 9,600 sqft in-fill building. Works also include the formation of a new multi-use games area (MUGA) pitch.

Cliff Wheatley, Managing Director for Galliford Try Building North West and Yorkshire, commented: “It is great to see this project reach the handover phase, with both staff and students delighted with the new building. This project is a fantastic addition to our portfolio and has proved a productive learning experience as we continue to develop our approach to producing net zero educational facilities.”

Featured News

Specification news
Leviat, Siderise and Ibstock unite for high-rise...

Photo: Jonathan Vaughan, Technical Manager – Masonry, LeviatLeviat, a world leader...

Read More >>

Specification news
ALTRO BRINGS IMMERSIVE WELLBING EXPERIENCE TO...

Visit Altro’s showroom during Clerkenwell Design Week and you’ll find it...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>