Life sciences hotspots create opportunities for new work

Latest News Mon, Aug 14, 2023 5:55 AM

Government plans for lab and tech space in Cambridge boost life sciences construction prospects, Glenigan has reported.

Michael Gove launches Cambridge Development Group to tackle tech firms' lab space wait, who typically have to wait almost a year for available lab space.

Today, this shortage of available space for life sciences firms underpins the healthy prospects for work in the sector. A report from Savills earlier this year pointed to a continued imbalance in supply and demand in the so-called Golden Triangle with the vacancy rate for fitted lab space below 1% in both Cambridge and London and 7% in Oxford.

With fitted lab space in these three cities commanding rents typically 70% higher than conventional office space, the appeal of the sector to developers – and hence the prospects for new construction contracts - remains strong.

Yet even before Mr Gove’s controversial proposals take effect, Glenigan data shows that a significant volume of new construction work linked to new lab space is underway, or in the pipeline, both in Cambridge and in other life sciences clusters around the country.

In London, a series of major office conversion projects are planned which will create new space for growing tech companies.

Last month, details emerged of plans by a Canadian investor, Oxford Properties, to convert an eight-storey former insurance office block which it owns in Bloomsbury Square into mostly ‘wet lab’ space for science-based businesses. Detailed plans have been granted for the £78.4 million conversion scheme, the Victoria House Redevelopment, which is being undertaken jointly with Pioneer Group and where work is set to start later this year and run for five months (Project ID: 23075876).

Further east in the capital, plans have been approved for the 23-storey Canary Wharf North Quay Life Science Building, a major £500 million project which will be the largest commercial wet lab-enabled life science building in Europe. Work on the project, involving nearly 80,000 sq m of space, is set to start later this year and run for 44 months (Project ID: 22120609).

Meanwhile in Cambridge itself, some inventive ways of creating new space for life sciences businesses are taking shape. At the Grafton Life Sciences Cambridge (pictured), a former shopping centre is being part-demolished and new space created for the life sciences sector alongside a new hotel and leisure quarter. Work on the £39.49 million scheme is set to get underway in the spring of next year and run for ten months (Project ID: 23099519).

New construction projects to increase capacity for the life sciences sector are emerging in other cities. In Manchester, plans are at the pre-tender stage for a £11.9 million, 39,000 sq ft life sciences building at Cheadle Royal Business Park where work could start next spring (Project ID: 23165010).

Meanwhile, in nearby Cheshire, plans have been approved for the £60.8 million Life Sciences Development at Alderley Park in Macclesfield involving two new office/laboratory buildings where work is set to start next summer (Project ID: 22066980).

Featured News

Specification news
WHEN ARCHITECTURAL AMBITION DEMANDS ENGINEERING...

In the creation of unique and impactful architectural design, architects need to have...

Read More >>

Specification news
Retail expansion creates major construction...

Larger retailers are investing increasing sums in updating and expanding their...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Gerflor Taraflex® Sports Flooring | 2024 | EN Brochure

Gerflor Taraflex® Sp...
By Gerflor

Download Now >>

Gerflor Social Housing Floors | 2024 | EN Brochure

Gerflor Social Housi...
By Gerflor

Download Now >>

Gerflor Retail Flooring | 2024 | EN Brochure

Gerflor Retail Floor...
By Gerflor

Download Now >>

Gerflor Industry Flooring | 2024 | EN Brochure

Gerflor Industry Flo...
By Gerflor

Download Now >>

Gerflor Hospitality Flooring | 2024 | EN Brochure

Gerflor Hospitality...
By Gerflor

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>