Latest News Mon, Jul 17, 2023 6:17 AM
The first of more than 60 240m deep geothermal boreholes has been completed on the Salisbury Square Development, a new civic hub in the heart of the Square Mile, making it the first scheme in the Square Mile to embrace a standalone closed loop cooling and heating solution which removes the requirement of gas.
The boreholes for the ground source heat pump solution are some of the deepest to ever be constructed in the City of London - at a depth of over three quarters of the height of the Shard – and are being installed by the scheme’s main contractor, Mace, and subcontractor, G Core.
The geothermal borehole system takes advantage of consistent temperatures deep underground and is the most energy efficient method of heating and cooling using all-electric solutions with power sourced from renewable sources with no burning of fossil fuels.
Photo: DBOX
The development, funded and delivered by the City of London Corporation, will house a flagship facility for His Majesty’s Courts and Tribunal Services (HMCTS) and a new state-of-the-art headquarters for the City of London Police. It will also include grade A office accommodation, a remodelled listed building, and an enlarged and improved public realm. The development will strengthen the City's justice system, provide the City of London Police force with the assets and infrastructure to fight cyber, fraud and economic crime, and enhance the City's reputation as a world-leading location to do business.
The completion of the first geothermal borehole is a major step forward for the Salisbury Square Development. The borehole will help to reduce the development’s carbon emissions and play a part in the City of London Corporation’s commitment to Net Zero by 2040.
Mace, main contractor on the scheme, also has a strong commitment to responsible business. Among the contractor’s sustainability ambitions included in its Responsible Business Strategy is the goal of saving 10m tonnes of carbon for clients.
Project Director for Mace Construct, Jeremy Eavis, said: "We are pleased to be supporting the City of London in delivering their high sustainability ambitions for the Salisbury Square development through embracing innovation.
“This network of 60 250m deep geothermal boreholes is the starting point for the ground-breaking installation of a closed loop system ground source heat pump in the City of London. This will mean the Salisbury Square Development will be off the gas grid, dramatically reducing its operational carbon”
Featured News
AKW, one of the UK’s leading providers of accessible showering and kitchen...
Iconic is an overused adjective, but it still holds true about the remarkable work of...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
AKW Bathroom Catalog...
By AKW
Baths Collection Bro...
By AKW
Your high performanc...
By James Hardie
James Hardie brings...
By James Hardie
fermacell® The Speci...
By James Hardie
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...
FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...
FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Specification Insights with Majestic London Showers
“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...
Portakabin | Installation at the iconic Admiralty Arch, London