First modules land for Single Living Accommodation at Imjin Barracks

Latest News Wed, Apr 5, 2023 6:05 AM

A £13m construction project to improve living conditions for soldiers at Imjin Barracks has reached a key milestone, following the arrival onsite of the first modules for new Single Living Accommodation (SLA).

The major infrastructure works at the Gloucestershire barracks are due for completion this summer and will provide 69 new single en-suite bedspaces, along with communal living and kitchen/diner facilities.

The project is being delivered by the Defence Infrastructure Organisation (DIO) on behalf of the British Army, contracting to off-site construction specialist Reds10 and Design and engineering consultants Arcadis.

Photo: Interior of new Single Living Accommodation at Imjin Barracks (MOD/Crown Copyright)

At the module landing event, Brigadier Richard Brown, the Army’s Head of Infrastructure Plans, said: “This is a significant milestone in building new Single Living Accommodation at Imjin Barracks, the first of over a hundred new SLA blocks due to be delivered across the Army estate. It’s great to see the progress being made here which will enhance the communal living experience for our people.

“The improvements underway at this site represent the ongoing and increasing investment right across the Army estate, to deliver the modern, sustainable facilities that soldiers need and deserve, and to enhance the environments in which they live, work and train.”

Modular by design, the new SLA block is manufactured off-site and features a high-spec interior fit-out, central break-out spaces and increased natural daylight into rooms. The building will use SMART building technology to react to external and internal elements to reduce energy consumption. It has achieved an ‘Excellent’ rating under the Defence Related Environmental Assessment Methodology (DREAM).

Warren Webster, Defence Infrastructure Organisation, MPP Programme Director, Army, said: “I am extremely proud of the team. We signed the construction contract with Reds10 twelve months ago and to be landing the first modules on site this week, with the whole project on track for completion this August, is just incredible. It not only demonstrates DIO’s commitment to providing quality accommodation to Service personnel, but also shows the significant benefits of permanent module off-site construction both in terms of speed of delivery and ability to meet demanding carbon net zero targets.”

This is the first of a number of projects that will follow this proven delivery model.

Paul Ruddick, Chairman of Reds10, said: “The SLA at Imjin Barracks is real, tangible proof of concept for Modern Methods of Construction (MMC). It shows, in practical terms, how MMC can deliver a high quality, fit for purpose product at speed. We are extremely proud to be working with the British Army, DIO, Arcadis, HLM Architects and everyone else involved in this project, it’s a true team effort.”

Steve Dixon, Arcadis Defence Sector Lead, said: “Arcadis are extremely proud to play a critical part in the delivery of the very first Single Living Accommodation net zero development in collaboration with the Defence Infrastructure Organisation and Reds10. We are delighted that the team have reached this significant milestone, bringing us closer to creating what is a step change to the lived experience for the soldiers at Imjin Barracks.”

Imjin Barracks is the first site to benefit under the Army’s Single Living Accommodation Programme, which is investing £1.2bn and delivering 8,500 SLA bedspaces over 10 years. In addition to this, 8,000 SLA bedspaces are being delivered by the Defence Estate Optimisation (DEO) Army Programme through new build SLA blocks and refurbishing works, bringing the combined total of SLA bedspaces being delivered over 10 years to 16,500.

Featured News

Specification news
Balfour Beatty launches updated Building New Futures...

Balfour Beatty has launched an update of its Building New Futures Sustainability...

Read More >>

Specification news
Growth returns but labour cost pressures intensify,...

Construction products manufacturing returned to growth in the second quarter of 2025,...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Retirement & Care Brochure

Retirement & Care
By AKW

Download Now >>

Kitchens Brochure

Kitchens
By AKW

Download Now >>

Colorcoat HPS200 Ultra super durable case studies Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Confidex® Guarantee datasheet Brochure

Confidex® Guarantee...
By Tata Steel

Download Now >>

Colorcoat Prisma® colour card Brochure

Colorcoat Prisma® co...
By Tata Steel

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

ParallelRoof 100
ParallelRoof 100

ParallelRoof 100 is a non-insulated conservatory system that provides the perfect solution for any...

Read More >>

MasterLine 8 Heritage Window and Door System
MasterLine 8 Heritage Window and Door System

MasterLine 8 is a high-specification, next-generation window and door system that delivers...

Read More >>

ConceptSystem 77 Heritage Window and Door System
ConceptSystem 77 Heritage Window and Door System

The ConceptSystem 77 system incorporates a comprehensive range of inward- and outward-opening window...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>