VolkerFitzpatrick and Kier JV (VFK) celebrate the launch of the Luton DART

Latest News Mon, Apr 3, 2023 6:03 AM

VFK, a Joint Venture between VolkerFitzpatrick and Kier is celebrating the full launch of the Luton DART, a fully automated and electrically powered people mover which connects Luton Airport Parkway station with London Luton Airport terminal.

The Luton DART (Direct Air-Rail Transit), which launched its 24-hour timetable this week, replaces the previous bus service and speeds passengers along the route in under four minutes.

The project was delivered by VFK for Luton Rising. The construction took place over four years in several phases, including the construction of the new Luton DART Parkway station, as well as a dedicated central terminal station.

The cable-driven system designed by Doppelmayr Cable Car uses the latest technology and innovation to transport passengers from the station to the terminal, operating seven days a week.

Other key elements of the project included a 310m viaduct running next to the existing rail line, the 750m gateway bridge which was constructed off-line and moved over the existing A1081 New Airport Way, and a 320m double-tunnel which required flexible formwork to achieve its curved geometry.

Striking architectural elements have also been incorporated into the design of the Luton DART, including iconic coloured canopies at both DART stations, and the installation of an active-LED system which illuminates the gateway bridge from below.

Chris Evans, managing director of VolkerFitzpatrick strategic projects, commented: “This exciting project has seen us utilise a combination of our expertise in highways, airports and rail infrastructure. By working safely and collaboratively to an exceptionally high standard, we are proud that the Luton DART will not only benefit airport passengers but also the people and businesses of Luton for years to come.”

Ross MacKenzie, managing director of Kier Infrastructure, said: “We’re proud to have delivered this landmark project alongside our joint venture partners, on behalf of Luton Rising. The work that our team has completed will transform the passenger experience, offering a faster and more convenient transfer service while improving accessibility and helping to support the future sustainable growth of London Luton Airport.”

Luton Rising CEO Graham Olver commented: “The Luton DART is a vital investment that signals our commitment to the ongoing success of the airport for the benefit of our passengers, airlines and the people of Luton. Everything that we do is aimed not only at supporting economic and employment growth but generating positive outcomes for the community and acting in an environmentally responsible way.”

The Luton DART project has supported the economic development of the local area by creating over 500 construction jobs and training 720 local people, of whom 40% were drawn from traditionally under-represented groups.

In December 2021, His Majesty, King Charles III paid a visit to the Luton DART as part of a wider visit to Luton. The King was one of the first people to travel on the system and made a special effort to speak with some of the many apprentices who have worked on the Luton DART project.

The electrically powered Luton DART also supports the future sustainable growth of London Luton Airport, by reducing the environmental impact of journeys to and from the airport and congestion on surrounding roads. In so doing, it will increase the rail modal share for passengers accessing the airport and support the Luton 2040 Vision for a carbon-neutral town.

Featured News

Specification news
UK-listed construction companies issue most profit...

UK-listed companies in the FTSE Construction and Materials sector issued eight profit...

Read More >>

Specification news
Landscape Institute Awards 2025 finalists announced

The Landscape Institute (LI) is delighted to announce the finalists of the LI Awards...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Rearo Tradeline Brochure

Rearo Tradeline
By Rearo

Download Now >>

Rearo Sustainability Plan Brochure

Rearo Sustainability...
By Rearo

Download Now >>

Rearo Stericlad Brochure

Rearo Stericlad
By Rearo

Download Now >>

A&S Landscape - Bumper Newsletter Brochure

A&S Landscape - Bump...
By A&S Landscape

Download Now >>

A&S Landscape - Contractors Brochure

A&S Landscape - Cont...
By A&S Landscape

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

NURTURE EARLY YEARS CUBICLES
NURTURE EARLY YEARS CUBICLES

The Nurture Range provides child-friendly, durable 12mm SGL washroom solutions for nurseries and...

Read More >>

Triumph Custom-fit Cubicles For The Most Sophisticated Spaces
Triumph Custom-fit Cubicles For The Most Sophisticated Spaces

Triumph Privacy offers enhanced privacy while maintaining the sleek aesthetic of the Triumph range....

Read More >>

ELEVATE CUSTOM-FIT CUBICLES WITH A PRIVACY OPTION
ELEVATE CUSTOM-FIT CUBICLES WITH A PRIVACY OPTION

Elevate cubicles offer enhanced height and privacy for superior comfort and security. Durable nickel...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>