Kier to provide new facilities for historic school

Latest News Wed, Mar 22, 2023 7:06 AM

Kier has started work on delivering new, purpose-built teaching facilities accommodation to Katharine Lady Berkeley’s School in Wotton-under-Edge, Gloucestershire - one of the oldest state schools in the country.

The school’s existing campus-style site will be enhanced by removing a number of older buildings and replacing these with a single three-storey teaching block and a separate activity studio.

The new three-storey block will include various teaching facilities and is designed to support the school’s goal of being net zero carbon in operation. PV panels on the roof, enhanced insulation levels, ground-source and air-source heat pumps will help the school achieve its sustainability goals and reduce operating costs.

In addition to the three-storey block and activity studio, an existing single storey block on the site will be refurbished, with extensions added to enhance the school’s sixth form facilities and to provide a bespoke area for the special educational needs department.

Externally, a new central courtyard will be built, providing additional seating and a performance stage. The parking facilities are being remodelled and an existing Multi-Use Games Area (MUGA) is being moved and replaced.

To deliver the works, Kier will use its new design platform kSchool, which creates unique designs for schools, with considerations for how the curriculum will be delivered and how best to make use of the site.

kSchool is the evolution of Kier’s design guidelines, which are based both on our experience in delivering over 200 projects for the Department for Education since 2007, and through listening to our clients.

Andy Bolas, regional director at Kier Construction Western & Wales, said: “This school was founded over 639 years ago and the buildings we’re upgrading were built post-war, so for us providing 21st Century accommodation is a real honour and something that we, as a Gloucestershire-based business, are incredibly proud of.

“Not only does this project further evidence our expertise in delivering state-of-the-art sustainable schools but also demonstrates our innovative kSchool design platform.”

The project was procured through the Department for Education (DfE) CF17 Framework, and work is expected to finish in Spring 2025.

Hannah Khan, acting Headteacher at Katharine Lady Berkeley’s School, said: “We are pleased to have been included in the first phase of the DfE School Rebuilding Programme.

“Over the past two years, the teams from DfE, Kier and Mace have worked closely with the school to ensure that the final design stays true to the school’s current campus feel, takes account of our stunning geographical location and the school’s vision for the future.

“We are excited to explore the new opportunities that this project will bring to our students and the school community.

“We look forward to working with Kier over the coming years.”

Featured News

Specification news
Performance You Can Build On: FassaTherm Frame Plus,...

Fassa Bortolo’s FassaTherm systems continue to set the benchmark for...

Read More >>

Specification news
STRESS AWARENESS MONTH: SIMPLE WORKPLACE REVERBERATION...

Stress Awareness Month is a useful reminder for employers to address workplace noise,...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>