First net zero school completed as part of rebuilding programme

Latest News Mon, Mar 20, 2023 6:54 AM

Wates completed the first Net Zero school as part of the Department for Education (DfE) School Rebuilding Programme – the £10m Littleborough Community Primary School in Rochdale, Greater Manchester.

The 2,243sq m two-storey project, has been constructed on land within the existing Littleborough campus. It will provide 14 new classrooms, a library, a new sports/assembly hall, Multi Use Games Area (MUGA) and a 420-place primary school providing 60 places for each year group along with a 26-place nursery.

Procured through the DfE’s Modern Methods of Construction framework, the scheme used our Adapt 3.0 component-based design to maximise sustainability and ensure the building is Net Zero Carbon in Operation (NZCiO).

This included an optimised thermal envelope with increased insulation and large, triple glazed windows to maximise daylight together with rooflights and lightwells, enhanced ventilation and Photovoltaic solar panels.

As part of Our Social Value commitments, £3.6m worth of initiatives were delivered to the local community, including nearly £80,000 invested in local charities and causes. All targets were exceeded, with 1,500 training weeks provided as well as a T-Level placement, 39 apprentices employed, and site visits and career advice given to 92 local students.

The project is the first to be completed as part of the DfE’s School Rebuilding Programme a 10-year scheme of works which is seeing the rebuilding or refurbishment of 500 schools and sixth form colleges across the country, transforming learning environments for pupils and teachers.

Construction started in September 2021 with all works carried out while the existing school was still in operation. The project has been delivered on time, and completion was celebrated with an event attended by delegates from across the delivery partnership, Rochdale Borough Council and the DfE.

Sarah Cooke, regional director for the Northwest at Wates, said: “Littleborough represents a step change in how schools are built, designed to not only provide brilliant, state-of-the-art learning facilities for pupils, but for the long-term benefit of the wider environment.

“We’ve been a partner to the DfE for years and it was an honour to be chosen to deliver this pioneering project. It’s benefited from the latest evolution of our Adapt system, while our experience using MMC to find sustainability solutions – for both public and private builds – has helped us deliver the DfE’s NZCiO goal. I congratulate all our teams on making this happen and look forward to our next completion.”

Baroness Barran, Parliamentary Under-Secretary of State for the School System and Student Finance, said: “We’re thrilled to be celebrating the opening of the new net zero building at Littleborough Primary, a £10m School Rebuilding Project that started in Sept 2021 and will mean 14 new classrooms, a library, a new sports hall and multi-use games area for the children and families in this area.

“This is the first entirely new building to have been completed and opened as part of the Government’s Schools Rebuilding Programme, which will see 500 schools across the country benefit from new and renovated energy efficient school buildings that local communities can be proud of.

“Thanks to Littleborough Primary and all its pupils, parents and staff for their support throughout the rebuild.”

Featured News

Specification news
Landmark development receives top industry accolades

The construction company behind a neighbourhood of 660 new homes is celebrating the...

Read More >>

Specification news
Marley SolarTile® secures CCPI accreditation

Marley’s SolarTile® range has been accredited under the Code for Construction...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Gerflor Taraflex® Sports Flooring | 2024 | EN Brochure

Gerflor Taraflex® Sp...
By Gerflor

Download Now >>

Gerflor Social Housing Floors | 2024 | EN Brochure

Gerflor Social Housi...
By Gerflor

Download Now >>

Gerflor Retail Flooring | 2024 | EN Brochure

Gerflor Retail Floor...
By Gerflor

Download Now >>

Gerflor Industry Flooring | 2024 | EN Brochure

Gerflor Industry Flo...
By Gerflor

Download Now >>

Gerflor Hospitality Flooring | 2024 | EN Brochure

Gerflor Hospitality...
By Gerflor

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>