BESA prompts government intervention in damper controversy

Latest News Fri, Mar 3, 2023 6:58 AM

The Office for Product Safety & Standards (OPSS) has said it will act to address the continued controversy surrounding the installation of smoke control dampers in buildings.

Its intervention follows a series of meetings with the Building Engineering Services Association (BESA) which had issued several urgent warnings about this potential Achilles heel in fire safety strategies for buildings.

The OPSS said it was responding to potential problems that had been brought to its attention by BESA and was now carrying out a documentation review.

“Some manufacturers, importers, or distributors of smoke control dampers are being contacted to provide documentation which includes but is not limited to, declarations of performance,” it announced.

“OPSS aims to provide targeted, risk-based and proportionate enforcement of construction products regulations and will act fairly and firmly where product risks exist,” it added.

BESA produced a technical bulletin (VH001) to address concerns about the way many smoke control dampers and fire dampers were being installed ahead of a full update of its industry guidance for the ‘Installation of Fire Dampers and Smoke Dampers’ (DW145) which is due to be released later this year.

The bulletin was published after several BESA members reported finding that a significant number of dampers had been incorrectly installed and, therefore, were unlikely to perform their function of reducing the spread of smoke in a building during a fire.

DW145 makes it clear that contractors must follow the manufacturer’s instructions to ensure fire dampers and smoke dampers are installed correctly and comply with fire regulations. However, the Association’s technical director Graeme Fox said those instructions were often confusing.

“For example, some clearly state that you should not use self-drilling, non-fusible fixings, but some are not so clear,” he said. “We briefed the OPSS about this problem and they have now informed us that they are contacting manufacturers and importers to ensure there is clarity and consistency in their declarations of performance.”

VH001 (version three) is freely available on the Association’s website and gives contractors the information and appropriate terminology so they can alert clients to this potentially life-threatening problem. This will be further clarified in the updated DW145.

The BESA bulletin also clarifies guidance and statutory requirements covering installation, testing and maintenance of fire dampers and smoke dampers including clients’ legal obligations to ensure their fire safety systems remain fit for purpose in line with the Regulatory Reform (Fire Safety) Order 2005 for England and Wales and the Fire Safety (Scotland) Regulations 2006.

It outlines the crucial role played by the penetration seal in ensuring the overall fire stopping integrity of an installation, the importance of maintenance teams being able to find and access dampers for testing and repair, and the need for designers and installers to seek expert advice from damper manufacturers.

“We are able to communicate the risks and solutions via our technical guidance, but the intervention of the OPSS is hugely significant and means the whole supply chain, including clients, will now be on full alert and unable to ignore the problem,” said Fox.

Featured News

Specification news
Morgan Sindall set to steer Brunswick Wharf...

Morgan Sindall Construction has been appointed as the main contractor for the highly...

Read More >>

Specification news
RIBA sets plan to improve working culture in...

The Royal Institute of British Architects (RIBA) has pledged to drive up workplace...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

AKW Bathroom Catalogue 2025 Brochure

AKW Bathroom Catalog...
By AKW

Download Now >>

Baths Collection Brochure Brochure

Baths Collection Bro...
By AKW

Download Now >>

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>