Latest News Mon, Jan 23, 2023 6:50 AM
University Hospitals Dorset (UHD) has announced that the new Royal Bournemouth Hospital is the first hospital facility in the UK being built using a groundbreaking AI technology, which increases efficiency and decreases costs.
The technology, Buildots, automatically analyses data captured at the site via helmet-mounted 360-degree cameras.
The platform then generates true-to-life progress reports supported by visuals, providing managers and stakeholders with accurate, objective data and in-depth analysis, leading to improved efficiency.

The Royal Bournemouth Hospital’s new BEACH building (Births, Emergency And Critical Care, Children’s Health) will include a new purpose-built maternity unit, purpose-built children's unit, enhanced emergency department and critical care unit. The total extension is 22,650m² and the design meets modern best practice standards and guidelines. It will also be a 'BREEAM Excellent' standard building, placing it in the top 10% of UK buildings in terms of sustainability.
The construction work has been designed to minimise disruptions to the Royal Bournemouth site over the duration of the project. The BEACH Building is planned to open in early 2025 and forms part of the £250m transformation of UHD’s hospitals, including Poole and Christchurch Hospitals.
The project is being undertaken by UHD’s main contractor for transformation, Integrated Health Projects (IHP) – an alliance between VINCI Construction UK and Sir Robert McAlpine.
Bruce Preston, Project Director, IHP: “We’re proud that the BEACH building construction is the first NHS transformation project to use this great system. By embracing Buildots smart technology, we’re able to use AI and 3D model vision to efficiently track build progress compared with design and schedule to help ensure we remain on course.”
Aviv Leibovici, Chief Product Officer, Buildots: "The new Royal Bournemouth Hospital building is incredibly complex, with purpose-built facilities for maternity and children's units, as well as emergency and critical care. We're proud that Buildots is enabling this complicated project to be completed in a most efficient manner, and hope that others will follow Bournemouth's lead in building the next generation of healthcare and other facilities."
Featured News
Dimplex has launched the Latitude Commercial heat pump, which at just 52 dB(A) at...
The R-47 Threshold drain has been meticulously created with precision and function in...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
2026 Product Brochur...
By The Radiator Compan...
System for Laying Fl...
By FassaFloor
Training for Excelle...
By Aico
The Connected Home S...
By Aico
Safety First, Aico F...
By Aico
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Partition wall systems made of glass allow transparent room partition. They open, divide and...
Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...
Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...