Building Safety - Levelling-Up Committee plan follow-up work in 2023

Latest News Tue, Dec 20, 2022 7:20 AM

The Levelling Up, Housing and Communities (LUHC) Committee has announced that it will be undertaking follow-up work on building safety in the New Year.

The Committee has invited Lee Rowley MP, Parliamentary Under Secretary of State (Local Government and Building Safety) to attend an evidence session in early 2023 (date tbc).

The Committee is likely to examine perceived gaps in the Building Safety Act 2022 and ongoing issues relating to building safety and remediation, including the liability of professional freeholders, the voluntary developer pledge and the fund for buildings 11-18m in height.

The Committee is also likely to explore questions around funding for non-cladding building safety works.

Chair of the Levelling Up, Housing and Communities (LUHC) Committee, Clive Betts, said: “Building safety and the remediation of historic defects have been a major area of scrutiny for the Committee since the Grenfell fire, including in our building safety remediation and funding report.

“There continue to be concerns over gaps in the Government’s Building Safety Act and questions over the funding of building safety works which the Committee will want to revisit at our evidence session with the Minister early next year.”

The LUHC Committee published its Building Safety: Remediation and Funding report on 11 March and made a series of recommendations to Government to ensure leaseholders did not have to pay to rectify faults to make their homes safe.

Featured News

Specification news
Put solar panels on all new homes to cut bills and...

All new homes should be required to have solar panels installed to meet green...

Read More >>

Specification news
BSI announces updated fire safety standard for fire...

Revised guidance providing critical information around fire protection in and around...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

AKW Bathroom Catalogue 2025 Brochure

AKW Bathroom Catalog...
By AKW

Download Now >>

Baths Collection Brochure Brochure

Baths Collection Bro...
By AKW

Download Now >>

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>