Latest News Tue, Oct 11, 2022 6:06 AM
Wates Construction has finished building the £72,300 sq ft Edgar Wood Academy in Greater Manchester, marking the culmination of a two-year project on behalf of the Department for Education (DfE).
The multi-million-pound Edgar Wood Academy is located on Rochdale Road, Middleton. Designed by architect Sheppard Robson, the school has the capacity to hold 900 pupils aged between 11 and 16 years old.
It features 23 general classrooms and 34 specialist classrooms across three floors, as well as a sports hall, sports pitches, and soft and hard play areas. It is being operated by the Altus Education Partnership, a charitable institution and registered company.

The school’s first cohort of 120 Year 7 students started last September. They were based at purpose-built temporary accommodation at Hopwood Hall College, around three miles away from the Edgar Wood Academy site. Those and future students are now based at the completed school.
Wates secured the work through the DfE’s £3bn Modern Methods of Construction Framework, to which it was appointed in January 2020. The framework is part of a wider government move towards adopting innovative offsite construction methods to deliver much-needed new schools across the country.
Dave Saville, Managing Director, Wates Construction North, said: “Edgar Wood’s completion provides a stellar example of how offsite construction can revolutionise the delivery of education builds.
“The lessons learnt on this build will support both Wates’ other DfE projects procured via the Modern Methods of Construction framework and help champion the use of MMC on other schemes across the country. Delivering this project efficiently was imperative to allow students to benefit from their improved facilities as quickly as possible.
“We hope the students and staff enjoy their new school and we look forward to our next completion as part of this framework.”
Another MMC scheme Wates is delivering through the DfE framework Star Salford Academy off Longshaw Drive in Little Hulton is part of the ongoing DfE’s Free School Programme. The six-acre site has been vacant since Hulton High School was demolished in 2009.
Once complete, the Sheppard Robson-designed Star Salford Academy will house 750 pupils within a 62,000 sq ft two-storey building. In addition to teaching spaces, there will also be a hard-court multi-use games area, all-weather pitch, and sports hall facility.
Wates is aiming to complete construction in time for the start of the 2023-2024 academic year.
Other education sector projects Wates has delivered within the North West include the 900-student Whitehaven Academy in Cumbria and the Hartford Church of England School in Northwich.
Featured News
UK construction companies signalled a sharp and accelerated reduction in business...
Door & Hardware Federation (DHF) has published new guidance exclusively for its...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
CemGold
By IPP
Mada ProGuard
By IPP
Scandinavian Furnitu...
By BJELIN
Fire Rated Loft Ladd...
By Premier Loft Ladders...
Flooring Collection...
By Gerflor
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...
Magply recovery and protection boards have been developed to meet the roofing industry needs for a...
Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...
Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...
This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...