BAM confirmed for net zero carbon in operation school

Latest News Tue, Jun 21, 2022 5:48 AM

BAM has been appointed through the Department for Education’s high value framework to redevelop Fred Longworth High School in Tyldesley, in Wigan, Greater Manchester.

The £24m contract will see BAM create a three-storey teaching block, to be handed over in September 2023. It will be Net Zero Carbon in Operation.

BAM is utilising its in house expertise, taking on architecture, M&E, sustainability and fixtures and fittings responsibility thanks to its integrated capabilities from BAM Design, while Hydrock is providing fire and acoustics, Nexus delivers ICT, and Dally Henderson Landscape.

The second phase involves the demolition of the majority of the existing school and construction of new sports pitches. This part of the project is due to be ready for spring 2024.

The project would increase the capacity of the school from 1,275 students to 1,350.

Construction issues include BAM creating a new overlay on an existing campus while it remains live, retaining three existing buildings, placing emphasis on intelligent sequencing. The scheme builds on the DfE’s new approach to sustainability, further developing innovation and methods from the initial pathfinder projects. The school will in part be constructed over Hindsford Brook culvert. Enabling works include diverting a main sewer running across the site and posing a critical constraint.

Restricted access means BAM will develop carefully co-ordinated traffic access and logistics plans and it has already taken steps to reduce deliveries and thus carbon emissions by increasing storage solutions on site.

A major part of the works includes dealing with matters in the ground including contamination and Japanese knotweed, and new services and drainage are required. Trees will also be protected.

Regional Director for BAM Construction in the North West, Ian Fleming, said:

“We have a very strong track record in the education sector across the UK and here in the North West, where we have delivered education facilities serving some 7,000 students over the past five years alone [see table below].

“Our ability to create net zero schools and use modern techniques such as our suite of digital construction methods and off-site manufacture and assembly allows us to reduce risks to our people and speed up delivery for the school.

“I’m looking forward to seeing us make excellent progress and to working with our friends and partners at the school and drawing out some benefits for the community around us.”

Fred Longworth is one of four Wigan schools earmarked for redevelopment under the DfE’s £1bn School Rebuilding Programme.

Featured News

Specification news
Leviat, Siderise and Ibstock unite for high-rise...

Photo: Jonathan Vaughan, Technical Manager – Masonry, LeviatLeviat, a world leader...

Read More >>

Specification news
ALTRO BRINGS IMMERSIVE WELLBING EXPERIENCE TO...

Visit Altro’s showroom during Clerkenwell Design Week and you’ll find it...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

Training for Excellence Brochure

Training for Excelle...
By Aico

Download Now >>

The Connected Home Solution Brochure

The Connected Home S...
By Aico

Download Now >>

Safety First, Aico First Brochure

Safety First, Aico F...
By Aico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Glass Partition Walls
Glass Partition Walls

Partition wall systems made of glass allow transparent room partition. They open, divide and...

Read More >>

FASSAFILL MEDIUM
FASSAFILL MEDIUM

Water repellent cement-based sealant for grouting joints from 2 to 12 mm, resistant to mould and...

Read More >>

FASSA AQUAZIP FAST
FASSA AQUAZIP FAST

Two-component elastic cement membrane, quick drying even at low temperatures, for waterproofing and...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

DAB EsyBox Pop | Compact booster pump for perfect home water pressure
DAB EsyBox Pop | Compact booster pump for perfect home water pressure

Struggling with weak showers and inconsistent flow? The DAB EsyBox Pop is the revolutionary,...

Watch Now >>

Marsh Industries - Phos-Lite
Marsh Industries - Phos-Lite

Marsh Industries - Phos-Lite

Watch Now >>

Marsh Industries - Nutra-Lite
Marsh Industries - Nutra-Lite

Marsh Industries - Nutra-Lite

Watch Now >>