Trains finally get green light to run on Elizabeth Line

Latest News Thu, May 5, 2022 6:11 AM

Transport for London (TfL) has confirmed that, subject to final safety approvals, the Elizabeth line will open on Tuesday 24 May 2022.

The Elizabeth line will transform travel across London and the South East by dramatically improving transport links, cutting journey times, providing additional capacity, and transforming accessibility with spacious new stations and walk-through trains.

The Elizabeth line will initially operate as three separate railways, with services from Reading, Heathrow and Shenfield connecting with the central tunnels from autumn this year.

In the coming weeks, Elizabeth line signage will continue to be uncovered across the network in preparation for the start of customer service. The updated Tube and Rail map will also be released later showing the new central section stations connected with the rest of the TfL network for the first time.

The new line is set to be crucial to London’s recovery from the pandemic, helping avoid a car-led recovery by providing new journey options, supporting regeneration across the capital, and adding an estimated £42bn to the UK economy.

The Elizabeth line will operate 12 trains per hour between Paddington and Abbey Wood from Monday to Saturday 06:30 to 23:00. Work will continue in engineering hours and on Sundays to allow a series of testing and software updates in preparation for more intensive services from the autumn.

All services between Reading and Heathrow to Paddington and Shenfield to Liverpool Street, currently operating as TfL Rail, will be rebranded to the Elizabeth line. Customers travelling between Reading or Heathrow into London will need to change at Paddington for services into the central section of the route, and customers from Shenfield into London will need to change at Liverpool Street. Services from Reading, Heathrow and Shenfield will connect with the central tunnels in autumn when frequencies will also be increased to 22 trains per hour in the peak between Paddington and Whitechapel.

Customers will be able to plan their journeys on the Elizabeth line using the TfL Go app and Journey Planner ahead of the railway opening. The new railway will connect stations such as Paddington to Canary Wharf in only 17 minutes, transforming how Londoners and visitors navigate the capital. This journey currently takes more than 30 minutes to complete using the Tube.

All Elizabeth line stations will be staffed from first to the last train, with a ‘turn up and go’ service offered to anyone needing assistance. Step-free access is in place from street to train across all Elizabeth line stations between Paddington and Woolwich.

Andy Byford, Transport for London's Commissioner, said: “I am delighted that we can now announce a date for the opening of the Elizabeth line in May. We are using these final few weeks to continue to build up reliability on the railway and get the Elizabeth line ready to welcome customers. The opening day is set to be a truly historic moment for the capital and the UK, and we look forward to showcasing a simply stunning addition to our network.”

“Work is ongoing at Bond Street Elizabeth line station, which means that it will not open with the other stations on 24 May. The station continues to make good progress and the team at Bond Street are working hard to open the station to customers later this year.

“Changes will be made to 14 bus routes to improve links to Elizabeth line stations in east and south-east London, where many customers will use buses to get to and from stations. The changes will take effect from Saturday 14 and Saturday 21 May. This includes the new route 304, which will operate between Manor Park and Custom House stations from 21 May.”

Featured News

Specification news
Kier appointed to deliver college campus redevelopment...

Kier has been appointed by the Department for Education to deliver a campus...

Read More >>

Specification news
Get in shape with Encasement’s pipe boxing range

Whatever pipework you need to conceal, Encasement’s Vetta pipe boxing and casings...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

AKW Bathroom Catalogue 2025 Brochure

AKW Bathroom Catalog...
By AKW

Download Now >>

Baths Collection Brochure Brochure

Baths Collection Bro...
By AKW

Download Now >>

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>

Dining Area Canopy at John Spendluffe Technology College
Dining Area Canopy at John Spendluffe Technology College

We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...

Watch Now >>