Latest News Fri, Apr 1, 2022 6:25 AM
Meta has opened its new London offices at King’s Cross, following a three-year build and fit out.
The office, 11-21 Canal Reach, is the Estate’s largest office building with capacity for 4,000 Meta employees. The arrival of Meta represents a major milestone and is the start of an expanding presence for the company at King’s Cross.
It will soon occupy more than 620,000 sq ft of commercial space across the neighbourhood when it takes occupation of 10 Lewis Cubitt Square later in the spring, providing up to 5,000 workstations for its staff in total.
With 425,000 sq ft of grade-A office space, 11-21 Canal Reach is one of the lowest embodied carbon buildings on the estate per sq ft. Designed by architects Bennetts Associates, the two buildings feature 42,000 sq ft of landscaped roof gardens and terraces with uninterrupted views over central London, promoting employee wellbeing as well as local biodiversity. Other partners on the Canal Reach project included BAM Construct UK and Ramboll.
Designed by Allford Hall Monaghan Morris (AHMM) Architects, the 196,000 sq ft building will open in Spring 2022 and offers nine floors of office space, a fifth-floor wraparound terrace and retail space at ground level. It was designed to encourage the wellbeing of the building’s users and ensure future flexibility and adaptability.
As well as extensive outdoor terraces, internal spaces have been designed to maximise natural light. Circulation routes through the building have been designed to be generous, uninterrupted and light filled, including the stairs and lobbies.
Employee wellbeing and fitness are also encouraged with prominent cycle entrances and parking, as well as changing facilities. Construction on 10 Lewis Cubitt Square was delivered by Kier.
Sustainability has been prioritised throughout the design and construction of the two workspaces and each is connected to the King’s Cross District Energy Network, meaning they benefit from zero carbon heating, hot water and cooling. The King’s Cross District Energy Network is powered by 100% renewable energy sources. King’s Cross announced that it had become carbon neutral in November 2021.
The two new buildings will become home to engineering teams working on Instagram, Reality Labs (which is building the future of connection within virtual and augmented reality), Workplace and Ads & Business Products.
London is already Meta’s largest engineering hub outside the US with more than 4,000 employees based at offices in Brock Street, Rathbone Place, Shaftesbury Avenue and now King’s Cross.
Steve Hatch, Vice President Northern Europe at Meta, said: “London is already our largest tech hub outside of the US and our new campus will now be home to thousands of high-skilled engineers. Our teams here are building innovative technologies to connect billions of people around the world and help small businesses grow, while also keeping our services safe.”
Helen Causer, office lead at King’s Cross, comments: “Our workplace routines have been turned upside down during the past two years and that makes the arrival of the first Meta employees at King’s Cross even more exciting. It reaffirms our view, and one that is shared by Meta, that the best spaces and places will always play a vital role in culture, connectivity and creativity and are fundamental to how our customers do business. This is an important milestone for the estate as well as London’s post-pandemic recovery.”
“BAM’s design, engineering and construction expertise was instrumental in creating this hugely impressive scheme,” added Rod Stiles, Director of BAM Construction London.
“Our work on assessing embodied carbon took sustainability to new limits and has given us lasting landmarks that create new standards. Delivering the project on behalf of Argent three weeks early during Covid was testament to the collaborative teamwork between Argent and BAM. It has been a challenge and a triumph.”
Featured News
Ensuring the correct materials are delivered on time is crucial for keeping projects...
The Government should introduce an independent national oversight mechanism and not...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
AKW Bathroom Catalog...
By AKW
Baths Collection Bro...
By AKW
Your high performanc...
By James Hardie
James Hardie brings...
By James Hardie
fermacell® The Speci...
By James Hardie
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...
Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...
Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...
CONSTRUCTION VIDEOS - LATEST VIDEOS
https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....
A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...
We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...