New designs revealed for Automated People Mover for HS2 in Birmingham

Latest News Fri, Feb 4, 2022 9:14 AM

New plans for the Automated People Mover (APM) linking HS2 Interchange Station with the NEC, Birmingham International Station and Birmingham Airport, have been submitted to Solihull Council.

HS2 gained Schedule 17 approval for the APM in August 2020. Since then, HS2 has worked closely with the Urban Growth Company (UGC) in Solihull to include extra design elements which will support wider growth plans at the UK Central Hub.

This includes an option to modify the alignment of the APM as part of a potential major transformation of Birmingham International Station to create a new, integrated multi-modal transport exchange.

The realignment would also support the UGC’s plans to deliver new commercial development and public realm opportunities on adjacent land.

The option involves a slight change to the route of the APM, as it passes Birmingham International Station and connects into Birmingham Airport. The plans will also integrate the APM stop with a revitalised public realm at Birmingham International Station, including additional planting and space for artwork to improve the passenger experience. A proposed green wall with climbing plants will also enhance biodiversity, provide seasonal colour and contribute to better air quality.

As with the original alignment a pedestrian footbridge would connect the APM stop with Birmingham International Station, allowing seamless connections between HS2 Interchange Station, Birmingham International Station, the National Exhibition Centre (NEC) and Birmingham Airport.

The APM will provide an efficient, accessible, reliable and environmentally friendly mode of transport, carrying up to 2,100 passengers per hour in each direction on a six-minute journey along the 2.3km route. The services every three minutes will travel along a viaduct for the entire route, over major obstacles such as M42, Pendigo Lake at the NEC and the West Coast Main Line.

Niki French, HS2’s Deputy Project Client for Interchange Station said: “The APM will connect high speed rail passengers to the classic rail network, supporting the shift from car use to public, mass transit transport, which is so important in achieving the UK’s target of net zero carbon.

“We have been working in partnership with the UGC, Solihull Council and the HS2 Independent Design Review Panel to develop an alternative proposal for the HS2 APM stop that can integrate in an accessible and sustainable way with the aspirational plans for future redevelopment of the Birmingham International Rail Station and its surroundings. This new alignment has enabled us to enhance the design of the APM stop and the public realm around it, to improve the passenger experience.”

Lisa Chaney, Programme Manager at the Urban Growth Company, said: “This realignment is subtle but critical because it allows for the future development of an adjacent area of land which is currently used for surface car parking. There is also the potential to deliver a new public plaza which will create an exciting sense of place and arrival. We’ve worked closely with HS2 to develop this proposal and it’s been a really good example of innovation through collaborative working and making sure that this national infrastructure delivers regional benefits.”

Once the proposal has been through the planning process, a decision will be taken at a later date by HS2, the UGC and the contractor appointed to build the APM as to which route will be constructed.

Interchange Station will be one of the best connected stations on the new high speed network in the Midlands. It is set to pave the way for huge growth plans at the Arden Cross site, which will be home to the station and is set to become a new mixed-use destination, supporting 30,000 jobs, up to 3,000 new homes and 70,000m2 of commercial space.

These will form part of the UGC’s vision for the UK Central Hub which will create an environment to support 70,000 jobs, 8,000 new homes and 650,000m2 of commercial space, generating £6.2bn GVA per year and bringing 1.3m people to within a 45-minute public transport commute of the station.

Featured News

Specification news
New report from NHBC Foundation projects five billion...

The NHBC Foundation has published a new report – the Water Compendium. This...

Read More >>

Specification news
New Geotone QuickLay PUR collection from Polyflor:...

Polyflor, the UK's commercial and residential vinyl flooring specialist, is delighted...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

ACO Blue Roof Guide – Vol 2 Brochure

ACO Blue Roof Guide...
By ACO Building Drainag...

Download Now >>

Stannah Commercial Brochure Brochure

Stannah Commercial B...
By Stannah Group

Download Now >>

Stannah Midilift CLS Brochure

Stannah Midilift CLS
By Stannah Group

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Supreme Heavy-Duty Loft Ladder
Supreme Heavy-Duty Loft Ladder

The Supreme heavy-duty loft ladder is supplied as a ready to fit unit. It is manufactured from high...

Read More >>

Designo Loft Ladder
Designo Loft Ladder

Insulated and Airtight wooden loft ladder……sets the standard for long-lasting quality and...

Read More >>

Elite Loft Ladder
Elite Loft Ladder

The Elite heavy-duty loft ladder...The Elite heavy duty concertina loft ladder is supplied without a...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Proctor Air® Product Explainer
Proctor Air® Product Explainer

Proctor Air® is an air and vapour permeable, highly water resistant roofing underlay. Its...

Watch Now >>

Discover the Power of Blue Roofs in Urban Flood Management
Discover the Power of Blue Roofs in Urban Flood Management

In this video, we explore how blue roofs are transforming urban landscapes by helping to mitigate...

Watch Now >>

RMD Profiles - UK Experts in Metal Decking, Design Installation
RMD Profiles - UK Experts in Metal Decking, Design Installation

At RMD Profiles, we’re more than just metal decking. From supply-only solutions to full design and...

Watch Now >>